1
MOHAMMADIAN BEHBAHANI ZAHRA ، KARIMI BEHROOZ ، Morteza Zarrabi ، Ashkan Mozdgir, "Designing an efficient supply chain network for public cord blood bank and quality prediction to improve performance: a case study in Iran", Operational Research, 2025 Jul
vol. 25,
no. ,
pp.-,
2025.
2
Javad Behnamian ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، FADAEI MOLOUDI MARZIEH, "Capacitated lot-sizing and production sequence problem with setups complexity", Scientia Iranica, 2025 Jun
vol. 32,
no. 4,
pp.-,
2025.
3
ALIZADEH MOHAMMADMAHDI ، KARIMI BEHROOZ, "A dynamic two-phased approach for planning downstream oil supply chain network under uncertainty", Computers and Industrial Engineering, 2024 Jul
vol. 0,
no. 194,
pp.1-20,
2024.
4
HAGHBAYAN MAHDI ، KARIMI BEHROOZ ، Ashkan Mozdgir ، Bahareh Abbaspanah, "Increasing the Efficacy of Umbilical Cord Blood Banking Using Machine Learning Algorithms: A Case Study from Royan Cord Blood Bank", Scientia Iranica, 2023 Dec
vol. 1,
no. 1,
pp.1-26,
2023.
5
ARABZADEH EHSAN ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Multi-period home health care routing and scheduling problem with the medical grouping of patients", Scientia Iranica, 2023 Oct
vol. 30,
no. 5,
pp.1781-1795,
2023.
6
FARGHADANI CHAHARSOOGHI PEDRAM ، KARIMI BEHROOZ, "A ROBUST OPTIMIZATION APPROACH FOR THE PRODUCTION-ROUTING PROBLEM WITH LATERAL TRANSSHIPMENT AND OUTSOURCING", Rairo-Operations Research, 2023 Jul
vol. 57,
no. 4,
pp.1957-1981,
2023.
7
ALIZADEH MOHAMMADMAHDI ، KARIMI BEHROOZ, "A trio of resiliency, reliability,, and uncertainty in to design and plan the downstream oil supply chain", Computers and Chemical Engineering, 2023 May
vol. 176,
no. 1,
pp.1-17,
2023.
8
FOROOZESH NAZANIN ، KARIMI BEHROOZ ، Seyed Meysam Mousavi ، Mohammad Mojtahedi, "A hybrid decision-making method using robust programming and interval-valued fuzzy sets for sustainable-resilient supply chain network design considering circular economy and technology levels", Journal of Industrial Information Integration, 2023 Apr
vol. 33,
no. 1,
pp.1-33,
2023.
9
VAGHEFZADEH MOHAMMADHOSEIN ، KARIMI BEHROOZ ، AHMADI ABBAS, "Modelling customer demand for mobile value-added services: non-stationary time series models or neural networks time series analysis?", International Journal of Industrial and Systems Engineering, 2023 Mar
vol. 43,
no. 4,
pp.555-581,
2023.
10
AGHAIE SEPIDEH ، KARIMI BEHROOZ, "Location-allocation-routing for emergency shelters based on geographical information system (ArcGIS) by NSGA-II (case study: Earthquake occurrence in Tehran (District-1))", Socio-Economic Planning Sciences, 2022 Nov
vol. 84,
no. 1,
pp.1-16,
2022.
11
SAGHIAN ZAHRA ، ESFAHANIPOUR AKBAR ، KARIMI BEHROOZ, "A novel dynamic fare pricing model based on fuzzy bi-level programming for subway systems with heterogeneous passengers", Computers and Industrial Engineering, 2022 Sep
vol. 172PB,
no. 0,
pp.108654-0,
2022.
12
SAGHIAN ZAHRA ، ESFAHANIPOUR AKBAR ، KARIMI BEHROOZ, "A novel Kumaraswamy interval type-2 TSK fuzzy logic system for subway passenger demand prediction", Iranian Journal of Fuzzy Systems, 2022 May
vol. 19,
no. 3,
pp.69-87,
2022.
13
FOROOZESH NAZANIN ، KARIMI BEHROOZ ، Seyed Meysam Mousavi, "Green-resilient supply chain network design for perishable products considering route risk and horizontal collaboration under robust", Journal of Environmental Management, 2022 Apr
vol. 307,
no. 1,
pp.1-29,
2022.
14
FATHOLLAHIFARD AMIR MOHAMMAD ، AHMADI ABBAS ، KARIMI BEHROOZ, "Sustainable and Robust Home Healthcare Logistics: A Response to the COVID-19 Pandemic", Symmetry-Basel, 2022 Jan
vol. 14,
no. 2,
pp.1-33,
2022.
15
POURMOHAMMAD ZIA NADIA ، KARIMI BEHROOZ ،, "Food supply chain coordination for growing items: A trade-off between market coverage and cost-efficiency", International Journal of Production Economics, 2021 Dec
vol. 242,
no. 1,
pp.1-20,
2021.
16
RAFIEE PARSA NEDA ، ، KARIMI BEHROOZ ، MOATTAR HUSSEINI S.MOHAMMAD, "A hybrid neural network approach to minimize total completion time on a single batch processing machine", International Transactions In Operational Research, 2021 Nov
vol. 28,
no. 28,
pp.2867-2899,
2021.
17
FATHOLLAHIFARD AMIR MOHAMMAD ، AHMADI ABBAS ، KARIMI BEHROOZ, "Multi-Objective Optimization of Home Healthcare with Working-Time Balancing and Care Continuity", Sustainability(Switzerland), 2021 Nov
vol. 13,
no. 22,
pp.1-33,
2021.
18
POURMOHAMMAD ZIA NADIA ، KARIMI BEHROOZ ،, "Dynamic pricing and inventory control policies in a food supply chain of growing and deteriorating items", Annals of Operations Research, 2021 Sep
vol. 305,
no. 0,
pp.1-40,
2021.
19
، DEYMEH HADI ، KARIMI BEHROOZ ،, "Incorporating sales and marketing considerations into a competitive multi-echelon distribution network design problem with pricing strategy in a stochastic environment", Journal of Retailing and Consumer Services, 2021 Jun
vol. 62,
no. 62,
pp.1-15,
2021.
20
KEYHANIAN SINA ، AHMADI ABBAS ، KARIMI BEHROOZ, "On pricing and bundling decisions for stackelberg games in parallel channels of substitutable composites", Rairo-Operations Research, 2021 Mar
vol. 55,
no. 0,
pp.1657-1704,
2021.
21
G. Reza Nasiri ، KALANTARI KHALILABAD MOHAMMAD ، KARIMI BEHROOZ, "Fast-moving consumer goods network design with pricing policy in an uncertain environment with correlated demands", Computers and Industrial Engineering, 2021 Feb
vol. 153,
no. 106997,
pp.1-15,
2021.
22
FOROOZESH NAZANIN ، Fariborz Jolai ، Seyed Meysam Mousavi ، KARIMI BEHROOZ, "A new fuzzy-stochastic compromise ratio approach for green supplier selection problem with interval-valued possibilistic statistical information", Neural Computing and Applications, 2021 Jan
vol. Jan. 2 202,
no. 0,
pp.1-21,
2021.
23
ABDOLLAHI KAMRAN MEHDI ، KARIMI BEHROOZ, "Investigating and Analysis of Hospital Performance Using Discrete Event Simulation", Aut Journal of Modeling and Simulation, 2020 Dec
vol. 52,
no. 2,
pp.1-19,
2020.
24
Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، Javad Behnamian ، FIROOZBAKHT JELVEH, "A multi-objective particle swarm optimization based on pareto archive for integrated production and distribution planning in a green supply chain", Applied Artificial Intelligence, 2020 Nov
vol. 0,
no. 0,
,
2020.
25
Mehdi A. Kamran ، KARIMI BEHROOZ ، Nico Dellaert, "A column-generation-heuristic-based benders' decomposition for solving adaptive allocation scheduling of patients in operating rooms", Computers and Industrial Engineering, 2020 Oct
vol. 148,
no. 0,
,
2020.
26
NADERI MEYSAM ، KHAMEHCHI EHSAN ، KARIMI BEHROOZ, "A rigorous approach to uncertain production optimization using a hybrid algorithm: Combination of a meta-heuristic and a Quasi-Newton method", Journal of Petroleum Science and Engineering, 2020 Sep
vol. 195,
no. 12,
,
2020.
27
NADERI MEYSAM ، KHAMEHCHI EHSAN ، KARIMI BEHROOZ, "Production Optimization Based on Integrated Modeling and Gradient Methods", Biointerface Research In Applied Chemistry, 2020 Jul
vol. 11,
no. 1,
pp.7665-7676,
2020.
28
POURMOHAMMAD ZIA NADIA ، KARIMI BEHROOZ, "Optimal Replenishment and Breeding Policies for Growing Items", Arabian Journal For Science and Engineering, 2020 Jun
vol. 45,
no. 0,
pp.7005-7015,
2020.
29
KEYHANIAN SINA ، AHMADI ABBAS ، KARIMI BEHROOZ, "A Study on Pricing under a Coopetitive and Duopolistic Market of Vertically Differentiated Products", Industrial Engineering and Management Systems, 2019 Dec
vol. 18,
no. 4,
pp.776-793,
2019.
30
Mehdi A. Kamran ، KARIMI BEHROOZ ، Nico Dellaert ، Erik Demeulemeester, "Adaptive operating rooms planning and scheduling: A rolling horizon approach", Operations Research For Health Care, 2019 Sep
vol. 22,
no. 0,
,
2019.
31
EBRAHIMI VOSTAKOLAEI MASOUD ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "APPLICATION OF THE PREVENTIVE MAINTENANCE SCHEDULING TO INCREASE THE EQUIPMENT RELIABILITY: CASE STUDY- BAG FILTERS IN CEMENT FACTORY", Journal of Industrial and Management Optimization, 2019 Jan
vol. 0,
no. 0,
,
2019.
32
RAHMATI SEYED HABIBOLLAH ، AHMADI ABBAS ، KARIMI BEHROOZ, "Developing simulation based optimization mechanism for a novel stochastic reliability centered maintenance problem", Scientia Iranica, 2018 Oct
vol. 25,
no. 5,
pp.2788-2806,
2018.
33
KAYVANFAR VAHID ، MOATTAR HUSSEINI S.MOHAMMAD ، Zhang NengSheng ، KARIMI BEHROOZ ، Sheikh Sajadieh Mohsen, "A practical supply-demand hub in industrial clusters: a new perspective", Management Research Review, 2018 Oct
vol. 0,
no. 0,
,
2018.
34
ABDOLLAHI KAMRAN MEHDI ، KARIMI BEHROOZ ، Nico Dellaert, "Uncertainty in advance scheduling problem in operating room planning", Computers and Industrial Engineering, 2018 Sep
vol. 126,
no. 0,
pp.252-268,
2018.
35
VAGHEFZADEH MOHAMMADHOSEIN ، KARIMI BEHROOZ, "Demand management using time series regression models in the context of mobile value-added services", , 2018 Sep
vol. 8,
no. 30,
pp.9-30,
2018.
36
KHAMEHCHI EHSAN ، NADERI MEYSAM ، KARIMI BEHROOZ, "Novel statistical forecasting models for crude oil price, gas price, and interest rate based on meta-heuristic bat algorithm", Journal of Petroleum Science and Engineering, 2018 Sep
vol. 172,
no. 0,
pp.13-22,
2018.
37
RAHMATI SEYED HABIBOLLAH ، AHMADI ABBAS ، KARIMI BEHROOZ, "Multi-objective evolutionary simulation based optimization mechanism for a novel stochastic reliability centered maintenance problem", Swarm and Evolutionary Computation, 2018 Mar
vol. 0,
no. 0,
pp.1-17,
2018.
38
REZAEI MAHDI ، AKBARPOUR SHIRAZI MOHSEN ، KARIMI BEHROOZ, "A multi objective SCOR-Based Decision Alignment for Supply Chain Performance Management", Scientia Iranica, 2018 Jan
vol. 0,
no. 0,
,
2018.
39
KAYVANFAR VAHID ، Sheikh Sajadieh Mohsen ، MOATTAR HUSSEINI S.MOHAMMAD ، KARIMI BEHROOZ, "Analysis of a multi-echelon supply chain problem using revised multi-choice goal programming approach", Kybernetes, 2017 Dec
vol. 0,
no. 0,
,
2017.
40
KAYVANFAR VAHID ، MOATTAR HUSSEINI S.MOHAMMAD ، KARIMI BEHROOZ ، Sheikh Sajadieh Mohsen, "Supply-demand hub in industrial clusters: a stochastic approach", Engineering Optimization, 2017 Dec
vol. 0,
no. 0,
,
2017.
41
TORKAMAN SOMAYE ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Hybrid simulated annealing and genetic approach for solving a multi-stage production planning with sequence-dependent setups in a closed-loop supply chain", Applied Soft Computing, 2017 Nov
vol. 0,
no. 0,
,
2017.
42
KAYVANFAR VAHID ، MOATTAR HUSSEINI S.MOHAMMAD ، Sheikh Sajadieh Mohsen ، KARIMI BEHROOZ, "A multi-echelon multi-product stochastic model to supply chain of small-and-medium enterprises in industrial clusters", Computers and Industrial Engineering, 2017 Nov
vol. 115,
no. 0,
pp.69-79,
2017.
43
EDALATPOUR MOHAMMADAMIN ، MIRZAPOUR ALEHASHEM SEYED MOHAMMAD JAVAD ، KARIMI BEHROOZ ، Bouchaib Bahli, "Investigation on a novel sustainable model for waste management in megacities: A case study in Tehran municipality", Sustainable Cities and Society, 2017 Oct
vol. 36,
no. 0,
pp.286-301,
2017.
44
TORKAMAN SOMAYE ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Multi-stage multi-product multi-period production planning with sequence-dependent setups in closed -loop supply chain", Computers and Industrial Engineering, 2017 Oct
vol. 113,
no. 0,
pp.602-613,
2017.
45
MAIHAMI REZA ، KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi, "Pricing and Inventory Control in a Supply Chain of Deteriorating Items: A Non-cooperative Strategy with Probabilistic Parameters", International Journal of Applied and Computational Mathematics, 2017 Sep
vol. 3,
no. 3,
pp.2477-2499,
2017.
46
REZAEI MAHDI ، AKBARPOUR SHIRAZI MOHSEN ، KARIMI BEHROOZ, "IoT based framework for performance measurement", Industrial Management and Data Systems, 2017 May
vol. 117,
no. 4,
pp.688-712,
2017.
47
DEZFOOLIAN HAMIDREZA ، AFRAZEH ABBAS ، KARIMI BEHROOZ, "A new model to optimize the knowledge exchange in industrial cluster: A case study of Semnan plaster production industrial cluster", Scientia Iranica, 2017 May
vol. 24,
no. 2,
pp.834-846,
2017.
48
KAYVANFAR VAHID ، MOATTAR HUSSEINI S.MOHAMMAD ، KARIMI BEHROOZ ، Sheikh Sajadieh Mohsen, "Bi-objective intelligent water drops algorithm to a practical multi-echelon supply chain optimization problem", Journal of Manufacturing Systems, 2017 May
vol. 44,
no. 0,
pp.93-114,
2017.
49
J. Behnanamian ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، FADAEI MOLOUDI MARZIEH, "A Markovian approach for multi-level multi-product multi-period capacitated lot-sizing problem with uncertainty in levels", International Journal of Production Research, 2017 Apr
vol. 0,
no. 0,
,
2017.
50
MIRDAR HARIJANI ALI ، MANSOUR SAEED ، KARIMI BEHROOZ, "A multi-objective model for sustainable recycling of municipal solid waste", Waste Management and Research, 2017 Apr
vol. 35,
no. 4,
pp.387-399,
2017.
51
MIRDAR HARIJANI ALI ، MANSOUR SAEED ، KARIMI BEHROOZ ، Chi-Guhn Lee, "Multi-period sustainable and integrated recycling network for municipal solid waste - A case study in Tehran", Journal of Cleaner Production, 2017 Mar
vol. 151,
no. 0,
pp.96-108,
2017.
52
، KARIMI BEHROOZ, "A simulated annealing algorithm for solving multi-depot location routing problem with backhaul", International Journal of Industrial and Systems Engineering, 2017 Feb
vol. 25,
no. 4,
pp.460-477,
2017.
53
ARABZADEH EHSAN ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "A new mathematical model for multi period multi depot home health care routing scheduling problem", Nursing Practice Today, 2016 Dec
vol. 3,
no. 4,
pp.140-151,
2016.
54
ABDOLLAHI KAMRAN MEHDI ، KARIMI BEHROOZ ، Hamidreza Bakhtiari ، Sina Masoom zadeh, "A resource allocation model in a healthcare emergency center using goal programming", Journal of Engineering Research, 2016 Dec
vol. 4,
no. 4,
pp.81-97,
2016.
55
RAFIEE PARSA NEDA ، KARIMI BEHROOZ ، MOATTAR HUSSEINI S.MOHAMMAD, "Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system", Computers and Operations Research, 2016 Dec
vol. 80,
no. 0,
pp.173-183,
2016.
56
RAFIEE PARSA NEDA ، KARIMI BEHROOZ ، MOATTAR HUSSEINI S.MOHAMMAD, "An improved memetic algorithm to minimize the earliness-tardiness on a single batch processing machine", Journal of Industrial and Systems Engineering, 2016 Nov
vol. 10,
no. 0,
pp.57-72,
2016.
57
KAMARIAN SAEED ، SHAKERI MAHMOUD ، KARIMI BEHROOZ ، Amin Pourasghar, "Free vibration analysis and design optimization of nanocomposite-laminated beams using various higher order beam theories and imperialist competitive algorithm", Polymer Composites, 2016 Aug
vol. 37,
no. 8,
pp.2442-2451,
2016.
58
Fatemi Ghomi Seyyed Mohammad Taghi ، KHOJASTE SARAKHSI MARYAM ، KARIMI BEHROOZ, "Joint economic lot-sizing problem for a two-stage supply chain with price-sensitive demand", Scientia Iranica, 2016 Jun
vol. 23,
no. 3,
pp.1474-1487,
2016.
59
RAFIEE PARSA NEDA ، KARIMI BEHROOZ ، MOATTAR HUSSEINI S.MOHAMMAD, "Minimizing total flow time on a batch processing machine using a hybrid max-min ant system", Computers and Industrial Engineering, 2016 Jun
vol. 0,
no. 0,
,
2016.
60
KARIMI BEHROOZ ، MOHAJER TABRIZI MOHAMMAD ، MIRHASSANI S.ALI, "A novel two-stage stochastic model for supply chain network design under uncertainty", Scientia Iranica, 2016 May
vol. 23,
no. 6,
pp.3046-3062,
2016.
61
MAIHAMI REZA ، KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi, "Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions", Annals of Operations Research, 2016 Apr
vol. 0,
no. 0,
,
2016.
62
MOZAFARI MARZIEH ، KARIMI BEHROOZ ، MAHOOTCHI MASOUD, "A differential Stackelberg game for pricing on a freight transportation network with one dominant shipper and multiple oligopolistic carriers", Scientia Iranica, 2016 Jan
vol. 23,
no. 5,
pp.2391-2406,
2016.
63
KHOJASTE SARAKHSI MARYAM ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem", Journal of Computational and Applied Mathematics, 2016 Jan
vol. 292,
no. 0,
pp.387-401,
2016.
64
HAJIAN HEIDARY MOJTABA ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Supply chain network design for deteriorating items with discount on transportation cost", Scientia Iranica, 2015 Dec
vol. 22,
no. 6,
pp.2634-2643,
2015.
65
MOZAFARI MARZIEH ، KARIMI BEHROOZ ، MAHOOTCHI MASOUD, "Dynamic pricing and freight transportation planning in oligopolistic freight networks: A game theoretic approach", Transportmetrica A-Transport Science, 2015 Oct
vol. 11,
no. 10,
pp.918-938,
2015.
66
RAMEZANI MAJID ، KIMIAGARI ALI MOHAMMAD ، KARIMI BEHROOZ, "interrelating physical and financial flows in a bi-objective closed-loop supply chain network problem with uncertainty", Scientia Iranica, 2015 May
vol. 22,
no. 3,
pp.1278-1293,
2015.
67
MOKHTARINEJAD MAEDE ، AHMADI ABBAS ، KARIMI BEHROOZ ، RAHMATI SEYED HABIBOLLAH, "A novel learning based approach for a new integrated location routing and scheduling problem within cross-docking considering direct shipment", Applied Soft Computing, 2015 May
vol. 0,
no. 0,
,
2015.
68
HAMTA NIMA ، FATTAHI MOHAMMAD ، AKBARPOUR SHIRAZI MOHSEN ، KARIMI BEHROOZ, "A Modified Benders Decomposition Algorithm for Supply Chain Network Design under Risk Consideration", Journal of Quality Engineering and Production Optimization, 2015 May
vol. 1,
no. 1,
,
2015.
69
JABERIPOUR MAJID ، Khorram Esmaile ، KARIMI BEHROOZ, "Random derivative- free algorithm for solving unconstrained or bound constrained continously differentiable non-linear problems", Optimization Methods and Software, 2015 Mar
vol. 0,
no. 0,
,
2015.
70
JAMSHIDI RASOUL ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Flexible supply chain optimization with controllable lead time and shipping option", Applied Soft Computing, 2015 Feb
vol. 30,
no. 0,
pp.26-35,
2015.
71
RASOULI SAADABAD HANIEH ، Rashidi Fariborz ، KARIMI BEHROOZ ، KHAMEHCHI EHSAN, "A Surrogate Integrated Production Modeling Approach to Long-Term Gas-Lift Allocation Optimization", Chemical Engineering Communications, 2014 Dec
vol. 202,
no. 5,
pp.647-654,
2014.
72
MOHAJER TABRIZI MOHAMMAD ، KARIMI BEHROOZ, "supply chain network design under uncertainty with new insights from contracts", Journal of Zhejiang University-Science C-Computers and Electronics, 2014 Dec
vol. 15,
no. 12,
pp.1106-1122,
2014.
73
MAIHAMI REZA ، KARIMI BEHROOZ, "Optimizing the pricing and replenishment policy for non-instantaneous deteriorating items with stochastic demand and promotional efforts", Computers and Operations Research, 2014 Nov
vol. 51,
no. 51,
pp.302-312,
2014.
74
RAHMATI SEYED HABIBOLLAH ، AHMADI ABBAS ، KARIMI BEHROOZ, "Facility Location and Inventory Balancing in a Multi-period Multiechelon Multi-objective Supply Chain: An MOEA Approach", Journal of Optimization In Industrial Engineering, 2014 Nov
vol. 16,
no. 0,
pp.83-99,
2014.
75
MOATTAARHOSSENI ZOHRE ، KARIMI BEHROOZ ، MOATTAR HUSSEINI S.MOHAMMAD ، GHODSYPOUR S.HASSAN, "Multi-objective integrated production distribution planning concerning manufacturing partners", International Journal of Computer Integrated Manufacturing, 2014 Oct
vol. ,
no. 0,
pp.1-18,
2014.
76
SOLTANI SEYEDABOLFAZL ، KARIMI BEHROOZ, "Cyclic hybrid flow shop scheduling problem with limited buffers and machine eligibility constraints", International Journal of Advanced Manufacturing Technology, 2014 Sep
vol. ,
no. 0,
,
2014.
77
KHALEDIAN KAZHAL ، Khorram Esmaile ، KARIMI BEHROOZ, "Characterizing epsilon-properly efficient solutions", Optimization Methods and Software, 2014 Aug
vol. **,
no. 0,
,
2014.
78
SHAHINMOGHADAM SARA ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Vehicle routing scheduling problem with cross docking and split deliveries", Computers and Chemical Engineering, 2014 Aug
vol. 69,
no. 0,
pp.98-107,
2014.
79
ENTEZARI ALIREZA ، KARIMI BEHROOZ ، Farhad Kianfar, "Optimal production control and marketing plan in two-machine unreliable flexible manufacturing systems", International Journal of Advanced Manufacturing Technology, 2014 Jul
vol. 73,
no. 0,
pp.487-496,
2014.
80
HOSSEINI SEYEDDAVOD ، AKBARPOUR SHIRAZI MOHSEN ، KARIMI BEHROOZ, "Cross-docking and milk run logistics in a consolidation network: A hybrid of harmony search and simulated annealing approach", Journal of Manufacturing Systems, 2014 Jun
vol. 0,
no. 0,
,
2014.
81
Ali Hoseinzadeh Kashan ، KARIMI BEHROOZ ، Azadeh Noktedan, "A novel discrete particle swarm optimization algorithm for the manufacturing cell formation problem", International Journal of Advanced Manufacturing Technology, 2014 May
vol. 73,
no. 0,
pp.1543-1556,
2014.
82
J. Behnamian ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، FADAEI MOLOUDI MARZIEH, "An iterative method for forecasting most probable point of stochastic demand", Journal of Industrial Engineering International, 2014 May
vol. 64,
no. 10,
,
2014.
83
HAJIAN HEIDARY MOJTABA ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "-", , 2014 Mar
vol. 0,
no. 42,
pp.18-25,
2014.
84
RAMEZANI MAJID ، KIMIAGARI ALI MOHAMMAD ، KARIMI BEHROOZ, "Closed-loop supply chain network design:: A financial approach", Applied Mathematical Modelling, 2014 Feb
vol. -,
no. 0,
,
2014.
85
RAMEZANI MAJID ، KIMIAGARI ALI MOHAMMAD ، KARIMI BEHROOZ ، HEJAZI TAHA HOSSEIN, "Closed-loop supply chain network design under a fuzzy environment", Knowledge-Based Systems, 2014 Feb
vol. -,
no. 59,
pp.108-120,
2014.
86
EBRAHIMI VOSTAKOLAEI MASOUD ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates", Applied Mathematical Modelling, 2013 Dec
vol. 0,
no. 0,
,
2013.
87
SHAHINMOGHADAM SARA ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Vehicle Routing with Cross Docking and Split Deliveries", , 2013 Nov
vol. 15,
no. 41,
pp.14-23,
2013.
88
MORADY GOHAREH MEHDY ، KARIMI BEHROOZ ، KHADEMIAN MAHDI, "A simulation-optimization approach for open-shop scheduling problem with random process times", International Journal of Advanced Manufacturing Technology, 2013 Oct
vol. 0,
no. 70,
pp.821-831,
2013.
89
RASOULI SAADABAD HANIEH ، Rashidi Fariborz ، KARIMI BEHROOZ, "Integrated gas lift system optimization", Theoretical Foundations of Chemical Engineering, 2013 Jul
vol. 47,
no. 4,
pp.397-405,
2013.
90
MAHMOUDZADEH MAHDI ، MANSOUR SAEED ، KARIMI BEHROOZ, "To Develop a Third Party Reverse Logistics Network for End-of-Life Vehicles in Iran", Resources Conservation and Recycling, 2013 Jul
vol. 78,
no. 0,
pp.1-14,
2013.
91
PARVARESH FERESHTEH ، HASHEMI GOLPAYEGANY S.ALIREZA ، MOATTAR HUSSEINI S.MOHAMMAD ، KARIMI BEHROOZ, "solving the p-hub median problem under intentional disruptions using simulated annealing", Networks and Spatial Economics, 2013 Jun
vol. 0,
no. 0,
,
2013.
92
SHOKOUHYAR SAJJAD ، MANSOUR SAEED ، KARIMI BEHROOZ, "A model for Integrating Services and product EOL management in sustainable product service system(S-PSS)", Journal of Intelligent Manufacturing, 2012 Nov
vol. 0,
no. 0,
,
2012.
93
PARVARESH FERESHTEH ، MOATTAR HUSSEINI S.MOHAMMAD ، HASHEMI GOLPAYEGANY S.ALIREZA ، KARIMI BEHROOZ, "Hub network design problem in the presence of disruptions", Journal of Intelligent Manufacturing, 2012 Nov
vol. 0,
no. 0,
,
2012.
94
HASANPOUR JESRI SEYED OMID ، AHMADI ABBAS ، KARIMI BEHROOZ ، AKBARPOUR SHIRAZI MOHSEN, "Hierarchical Data Clustering Model for Analyzing Passengers Trip in Highways", International Journal of Industrial Engineering and Production Research, 2012 Nov
vol. 23,
no. 4,
pp.253-259,
2012.
95
JAMSHIDI RASOUL ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Multi-objective green supply chain optimization with a new hybrid memetic algorithm using the Taguchi method", Scientia Iranica, 2012 Aug
vol. 0,
no. 0,
,
2012.
96
SHOKOUHYAR SAJJAD ، MANSOUR SAEED ، KARIMI BEHROOZ, "Simulation-based optimization of ecological leasing: a step ( toward extended producer responsibility (EPR)", International Journal of Advanced Manufacturing Technology, 2012 Jul
vol. 0,
no. 0,
,
2012.
97
، Lionel Amodeo ، Farouk Yalaoui ، KARIMI BEHROOZ, "Single Machine Scheduling with Rejection: Minimizing Total Weighted Completion Time and Rejection Cost", International Journal of Applied Evolutionary Computation(Ijaec), 2012 May
vol. 3,
no. 2,
pp.42-61,
2012.
98
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ, "New lower bounds for the optimal makespan on a single bach processing machine", , 2012 Mar
vol. 43,
no. 2,
pp.73-84,
2012.
99
NAIMI-SADIGH ALI ، MOZAFARI MARZIEH ، KARIMI BEHROOZ, "Manufacturer-retailer supply chain coordination: A bi-level programming approach", Advances In Engineering Software, 2012 Feb
vol. 45,
no. 0,
pp.144-152,
2012.
100
NAIMI-SADIGH ALI ، KARIMI BEHROOZ ، ZANJIRANI FARAHANI REZA, "A game theoretic approach for two echelon supply chains with continuous depletion", International Journal of Management Science and Engineering Management, 2011 Dec
vol. 6,
no. 6,
pp.408-412,
2011.
101
HEKMATFAR MASOOD ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan", Applied Soft Computing, 2011 Sep
vol. 0,
no. 0,
,
2011.
102
JABERIPOUR MAJID ، Khorram Esmaile ، KARIMI BEHROOZ, "Particle swarm algorithm for solving systems of nonlinear equations", Computers and Mathematics With Applications, 2011 Jul
vol. 62,
no. 2,
pp.566-576,
2011.
103
MARJANI MOHAMMADREZA ، MOATTAR HUSSEINI S.MOHAMMAD ، KARIMI BEHROOZ, "Bi-objective heuristics for multi-item freights distribution planning problem in crossdocking networks", International Journal of Advanced Manufacturing Technology, 2011 Jul
vol. 0,
no. 0,
pp.1-16,
2011.
104
MOZAFARI MARZIEH ، KARIMI BEHROOZ, "Pricing for freight carriers in a competitive environment: A game theory approach", International Journal of Industrial Engineering Computations, 2011 Jul
vol. 2,
no. 3,
pp.467-478,
2011.
105
Abbas Aghajani BazzaziAb ، Osanloo MortezaGholi ، KARIMI BEHROOZ, "A new fuzzy multi criteria decision making model for open pit mines equipment selection", Asia-Pacific Journal of Operational Research, 2011 May
vol. 28,
no. 3,
pp.279-300,
2011.
106
Saeed Soltan Mohamadi ، HEZARKHANI ARDESHIR ، Erhan Tercan ، KARIMI BEHROOZ, "USE OF GENETIC ALGORITHM IN OPTIMALLY LOCATING ADDITIONAL DRILL HOLES", Journal of Mining Science, 2011 May
vol. 47,
no. 1,
pp.62-72,
2011.
107
MOHAMMADI MOHAMMAD ، Seyyed Ali Torabi ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups", International Journal of Advanced Manufacturing Technology, 2010 Oct
vol. 49,
no. 0,
pp.201-211,
2010.
108
RAFIEE PARSA NEDA ، KARIMI BEHROOZ ، HOSSEINZADEH KASHAN ALI, "A branch and price algorithm to minimize makespan on a single batch processing machine with non-identical job sizes", Computers and Operations Research, 2010 Oct
vol. 37,
no. 10,
,
2010.
109
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ ، FARBORZ JOLAE, "An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes", Engineering Applications of Artificial Intelligence, 2010 Sep
vol. 23,
no. 6,
pp.911-922,
2010.
110
AVAZBEIGI MILAD ، HASHEMI DOULABI SEYED HOSSEIN ، KARIMI BEHROOZ, "Choosing the appropriate order in fuzzy time series: A new N-factor fuzzy time series for prediction of the auto industry production", Expert Systems With Applications, 2010 Aug
vol. 37,
no. 8,
pp.5630-5639,
2010.
111
NOKTEHDAN AZADEH ، KARIMI BEHROOZ ، HOSSEINZADEH KASHAN ALI, "A diffferential evolotion algorithm for the manufacturing cell formation problem using group based operators", Expert Systems With Applications, 2010 Jun
vol. 37,
no. 7,
pp.4822-4829,
2010.
112
Davoudpour HAMID ، KARIMI BEHROOZ, "a Lagrangian-based solution algorithm for supply chain distribution planning in uncertain environment", International Journal of Information Technology and Decision Making, 2010 May
vol. 9,
no. 3,
,
2010.
113
MOHAMMADI MOHAMMAD ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، Seyyed Ali Torabi, "MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups", International Journal of Production Research, 2010 May
vol. 48,
no. 15,
pp.2957-2973,
2010.
114
MANSOUR SAEED ، KARIMI BEHROOZ, "Designing a Revese logistics network for end -of-life vehicle recovery", Mathematical Problems In Engineering, 2010 Apr
vol. 20,
no. 10,
,
2010.
115
KHADEMI ZARE HASSAN ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، JENABI MASOUD ، RAAD ABBAS, "Development of a solution approach based on Lagrangian relaxation and genetic algorithm for multi-product multi-stage multi-period lot size determination problem with constrained resources", , 2010 Apr
vol. 44,
no. 1,
pp.25-37,
2010.
116
KARIMI BEHROOZ, "Reverse logistics network design using simulated annealing", The International Journal of Advanced Manufacturing Technology, 2010 Apr
vol. 47,
no. 3,
,
2010.
117
HAJIREZAEE MAHDI ، MOATTAR HUSSEINI S.MOHAMMAD ، ABDOLLAHZADEHBARFOROUSH AHMAD ، KARIMI BEHROOZ, "modeling and evaluating the strategic effects of improvement programs on the manufacturing performance using neural networks", African Journal of Business Management, 2010 Apr
vol. 4,
no. 4,
,
2010.
118
MOHAMMADI MOHAMMAD ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، Seyyed Ali Torabi, "Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups", Journal of Intelligent Manufacturing, 2010 Apr
vol. 21,
no. 0,
pp.501-510,
2010.
119
Davoudpour HAMID ، KARIMI BEHROOZ, "The Impact of Integrated Analysis on Supply chain management: A coordinated approach for inventory control Policy", Supply Chain Management-An International Journal, 2010 Jan
vol. 15,
no. 4,
,
2010.
120
KHAMEHCHI EHSAN ، Rashidi Fariborz ، KARIMI BEHROOZ ، POR AFSHARI, "Nonlinear Approach for Oil Field Optimization Based on Gas Lift Optimization", Oil Gas-European Magazine, 2009 Dec
vol. 35,
no. 4,
pp.181-187,
2009.
121
، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "new dispatching rules to minimize rejection and trdiness costs in a dynamic flexble flow shop", , 2009 Dec
vol. ,
no. 8,
,
2009.
122
KARIMI BEHROOZ, "The economic lot scheduling problem in flow lines with sequence-dependent setup", Journal of Industrial Engineering & Production Research, 2009 Sep
vol. 20,
no. 0,
,
2009.
123
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi, "A note on minimizing makespan on a single batch processing machine with nonidentical job sizes", , 2009 Jun
vol. ,
no. 410,
,
2009.
124
JOULAI GHAZVINI FARIBORZ ، SHEIKH SHAYA ، ، KARIMI BEHROOZ, "A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection", , 2009 May
vol. ,
no. 0,
,
2009.
125
، KARIMI BEHROOZ ، JOULAI GHAZVINI FARIBORZ, "flow shop scheduling with two batch processing machines and nonidentical job sizes", , 2009 Apr
vol. ,
no. 45,
,
2009.
126
AGHAJANI BAZZAZI ABBAS ، Osanloo MortezaGholi ، KARIMI BEHROOZ, "Optimal Open Pit Mining Equipment Selection Using Fuzzy Multiple Attribute Decision Making Approach", Archives of Mining Sciences, 2009 Feb
vol. ,
no. 2,
,
2009.
127
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ, "A discrete particle swarm optimization algorithm for scheduling parallel machines", Computers and Industrial Engineering, 2009 Feb
vol. ,
no. 56,
,
2009.
128
MOHAMMADI MOHAMMAD ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ ، TORABI SYEED ALI, "Devepment of Heuristics for Multi -Product Multi -Level Capacitated Lotsizing Problem With Sequence-Dependent Setups", Journal of Applied Sciences, 2009 Jan
vol. ,
no. 9,
,
2009.
129
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ, "An Improved Mixed Integer Linear Formulation and Lower Bounds for Minimizing Makespan on a Flow Shop With Batch Processing Machines", , 2009 Jan
vol. 0,
no. 40,
,
2009.
130
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ, "Scheduling Single Batch-Processing Machine With Arbitrary Job Sizes and Incompatible job Families an ant Colony Framework", Journal of The Operational Research Society, 2008 May
vol. ,
no. 59,
,
2008.
131
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ ، JENABI MASOUD, "A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes", , 2008 Apr
vol. ,
no. 35,
,
2008.
132
ZOLFI HOSSEIN ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Supply Chain Operations Planning with Setup Times and Multi Period Capacity Consumption", , 2007 Dec
vol. ,
no. 246,
,
2007.
133
Osanloo MortezaGholi ، GHOLAM NEJAD JAVAD ، KARIMI BEHROOZ, "Long -Term Open Pit Mine Production Planning : A Review of Models and Algorithms", , 2007 Jul
vol. 0,
no. 2007,
,
2007.
134
ZANJIRANI FARAHANI REZA ، KARIMI BEHROOZ ، TAMADON SARA, "Designing an Efficient Method for Simultaneously Determining The Loop and The Location of The P/D Stations Using Genetic Algorithm", International Journal of Production Research, 2007 Mar
vol. ,
no. 6,
,
2007.
135
NASIRI GHOLAMREZA ، KARIMI BEHROOZ ، TORABI SYEED ALI ، JOULAI GHAZVINI FARIBORZ, "Hierarchical Production Planning in make-to-order systems (with a case study)", , 2007 Feb
vol. ,
no. ,
,
2007.
136
JENABI MASOUD ، Fatemi Ghomi Seyyed Mohammad Taghi ، TORABI SYEED ALI ، KARIMI BEHROOZ, "Two Hybrid Meta -Heuristics for The Finite Horizon ELSP in Flexible Flow Lines With Unrelated Parallel Machines", Applied Mathematics and Computation, 2007 Jan
vol. ,
no. 186,
,
2007.
137
AKRAMI DASTGIRANI BEHROOZ ، KARIMI BEHROOZ ، MOATTAR HUSSEINI S.MOHAMMAD, "Two Metaheuristic Methods for The Common Cycle Economic Lot Sizing and Scheduling in Flexible Flow Shops With Limited Intermediate Buffers :The Finite Horizon Case", Applied Mathematics and Computation, 2006 Dec
vol. ,
no. 183,
,
2006.
138
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ ، JOULAI GHAZVINI FARIBORZ, "Minimizing Makespan on a Single Batch Processing Machine With Non-Identical Job Sizes:A Hybrid Genetic Approach", , 2006 Dec
vol. ,
no. 3906,
,
2006.
139
SAMIE DALUIE SAIED ، KARIMI BEHROOZ, "Two-Machine no -Wait Flow Shop Scheduling Problem With Precedence Constraints", , 2006 Dec
vol. ,
no. 1,
,
2006.
140
KHADEMI ZARE HASSAN ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Developing a Heuristic Algorithm for Order Production Planning Using Network Models Under Uncertainty Conditions", Applied Mathematics and Computation, 2006 Nov
vol. ,
no. 182,
,
2006.
141
TORABI SYEED ALI ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "A Hybrid Genetic Algorithm for Finite Horizon Economic Lot and Delivery Scheduling in Supply Chains", European Journal of Operational Research, 2006 Jul
vol. ,
no. 173,
,
2006.
142
HOSSEINZADEH KASHAN ALI ، KARIMI BEHROOZ ، F Jolai, "Effective Hybrid Genetic Algorithm for Minimizing Makespan on a Single -Batch -Processing Machine With Non-Identical Job Sizes", International Journal of Production Research, 2006 Jun
vol. ,
no. 12,
,
2006.
143
GHOLAM NEJAD JAVAD ، Osanloo MortezaGholi ، KARIMI BEHROOZ, "A Chance-Constrained Programming Approach for Open Pit Long -Term Production Scheduling in Stochastic Environments", , 2006 Feb
vol. ,
no. 106,
,
2006.
144
KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi ، J.M Wilson, "A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over", Journal of The Operational Research Society, 2006 Feb
vol. ,
no. 57,
,
2006.
145
TORABI SYEED ALI ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "The finite horizon economic lot scheduling in flexible flow lines", , 2005 Aug
vol. ,
no. 3,
,
2005.
146
TORABI SYEED ALI ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "Economic Lot Scheduling in Flexible Job Shops", , 2005 Jul
vol. ,
no. 2,
,
2005.
147
TORABI SYEED ALI ، KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi, "The common cycle economic lot scheduling in flexible job shops: The finite horizon case", International Journal of Production Economics, 2005 Jul
vol. ,
no. 1,
,
2005.
148
TORABI SYEED ALI ، Fatemi Ghomi Seyyed Mohammad Taghi ، KARIMI BEHROOZ, "The Economic Lot and Delivery Scheduling Problem in Flexible Job Shops", , 2005 May
vol. 0,
no. 0,
,
2005.
149
HOSSEINI SEYYED TAGHI ، MOATTAR HUSSEINI S.MOHAMMAD ، KARIMI BEHROOZ, "Determining number of Kanbans in Dynamic JIT systems", , 2005 Mar
vol. ,
no. 18,
,
2005.
150
KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi ، J.M Wilson, "Classification of Single Level lot sizing Models", , 2003 Jun
vol. ,
no. 3,
,
2003.
151
KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi ، J.M Wilson, "The capacitated lot sizing problem : A review of models and algorithms", , 2003 May
vol. ,
no. 31,
,
2003.
152
KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi, "A new heuristic for the CLSP problem with backlogging and set-up carryover", , 2002 Dec
vol. ,
no. 5,
,
2002.
153
KARIMI BEHROOZ ، Fatemi Ghomi Seyyed Mohammad Taghi, "New Heuristic Methods for Single-Level, multi-product Capacitated Dynamic Lot Sizing with Setup Carry overs", , 2002 Nov
vol. ,
no. 3,
,
2002.