1
SABBAGHI MILAD ، Farrokh Ebrahim, "Integrated assessment of geological, operational, and machine related parameters for optimization of TBM disc cutter life", Results In Engineering, 2026 Dec
vol. 32,
no. 112116,
pp.1-21,
2026.
2
NIKBAKHT NASRABADI REZA ، Farrokh Ebrahim ، MAAREFVAND PARVIZ, "Effects of operational parameters on TBM disc cutter wear: insights from full-scale disc abrasion testing (FDAT)", Tunnelling and Underground Space Technology, 2026 Apr
vol. 174,
no. 107672,
pp.1-16,
2026.
3
NIKBAKHT NASRABADI REZA ، Farrokh Ebrahim ، MAAREFVAND PARVIZ, "Full-Scale Experimental Study on TBM Disc Cutter Wear: Influence of Rock Type and Operating Conditions", Rock Mechanics and Rock Engineering, 2026 Apr
vol. ,
no. 1,
pp.1-21,
2026.
4
Kalantari Dehaghi Ali ، Farrokh Ebrahim ، Molladavoodi Hamed, "Evaluation of the effect of temperature and number of heating cooling cycles on the damage of rock salt", , 2026 Mar
vol. 9,
no. 4,
pp.73-91,
2026.
5
FATTAHI DEHKABOODI SHAHIN ، Farrokh Ebrahim ، Dehghani Hesam ، Fayazi Aref, "CASE STUDY ON OPTIMIZING DISC CUTTER SPACING BASED ON VERTICAL FORCE THRESHOLD IN COLORADO RED GRANITE CUTTING USING LS-DYNA SOFTWARE", Rudarsko-Geolosko-Naftni Zbornik, 2026 Jan
vol. 41,
no. ,
pp.129-142,
2026.
6
Farrokh Ebrahim ، Lotfi Davood ، Gholami Mohsen ، Hosseini Mohammad, "EPB-TBM performance enhancement through cutterhead modification in Shiraz Metro Line 3", Results In Engineering, 2026 Jan
vol. 108917,
no. 29,
pp.1-13,
2026.
7
Farrokh Ebrahim ، Lotfi Davood, "Enhancing micro tunnel boring machine efficiency: Optimal design of gauge triple disc cutters", Tunnelling and Underground Space Technology, 2025 Dec
vol. 107330,
no. 170,
pp.1-24,
2025.
8
ROUHANI HOOMAN ، ARASH MEHDI ، Farrokh Ebrahim, "Investigating the effects of confining pressure and loading rate on damage propagation and mode I stress intensity factor of granite using the RHT constitutive model", Geomechanics and Geophysics For Geo-Energy and Geo-Resources, 2025 Jul
vol. 11,
no. 79,
pp.1-18,
2025.
9
MOHAMMAD MATIN ROUHANI ، Farrokh Ebrahim, "TBM performance prediction based on XGBoost models: a case study of the ghomrud water conveyance tunnel (Lots 3 and 4)", Bulletin of Engineering Geology and The Environment, 2025 May
vol. 84,
no. 304,
pp.1-22,
2025.
10
Farrokh Ebrahim ، Davood Lotfi, "Decision tree analysis of cutter selection for tunnel boring machines: A study of geological conditions and machine types in high-performing TBM projects", Tunnelling and Underground Space Technology, 2025 Apr
vol. 162,
no. 106612,
pp.1-14,
2025.
11
Young Jin Shin ، Farrokh Ebrahim ، Jaehoon Jung ، Hanbyul Kang, "Optimizing Tunnel Boring Machine Operations in Real Time within Defined Constraints", Journal of Construction Engineering and Management, 2025 Mar
vol. 151,
no. 6,
pp.1-14,
2025.
12
Farrokh Ebrahim, "Optimum design specifications of TBM cutterheads in soft ground conditions based on field data analysis", Tunnelling and Underground Space Technology, 2025 Mar
vol. 161,
no. 106522,
pp.1-14,
2025.
13
Farrokh Ebrahim, "Evaluating the Penetration Rate of Earth Pressure Balance Tunnel Boring Machines", Amirkabir Journal of Civil Engineering, 2024 Oct
vol. 56,
no. 11,
pp.1431-1452,
2024.
14
ROUHANI HOOMAN ، Farrokh Ebrahim, "Failure analysis of Nehbandan granite under various stress states and strain rates using a calibrated Riedel-Hiermaier-Thoma constitutive model", Geomechanics and Geophysics For Geo-Energy and Geo-Resources, 2024 Sep
vol. 10,
no. 157,
pp.1-23,
2024.
15
MOHAMMADI DARIUSH ، SHAHRIAR KOUROSH ، MAAREFVAND PARVIZ ، Farrokh Ebrahim, "Cutting wheel opening configuration in soft ground shield tunneling by considering field and numerical studies", Journal of Mining and Environment, 2024 Aug
vol. 0,
no. 0,
,
2024.
16
Farrokh Ebrahim ، Hamid Rokhy ، Davood Lotfi, "On the application of RHT model and SPG algorithm for the analysis of rock cutting process", Simulation Modelling Practice and Theory, 2024 Aug
vol. 136,
no. 103012,
pp.1-15,
2024.
17
Farrokh Ebrahim, "Design and optimization of layout patterns for rock TBM cutterheads", Geomechanics and Engineering, 2024 Jul
vol. 38,
no. 2,
pp.179-189,
2024.
18
HEYDARI MEHDI ، Farrokh Ebrahim ، Khoshrou S.Hasan, "Parameter determination of Johnson-Holmquist-Cook constitutive model and calibration for Indiana Limestone", Geomechanics and Geophysics For Geo-Energy and Geo-Resources, 2024 Jul
vol. 10,
no. 122,
pp.1-26,
2024.
19
Farrokh Ebrahim ، Hamid Rokhy ، Davood Lotfi, "Evaluation of side forces for gauge cutters through LS-DYNA 3D numerical simulations", Arabian Journal of Geosciences, 2024 Jun
vol. 17,
no. 211,
pp.1-8,
2024.
20
MOHAMMAD MATIN ROUHANI ، Farrokh Ebrahim, "Chisel bits cutting force estimation using XGBoost and different optimization algorithms", Computers and Geotechnics, 2024 May
vol. 172,
no. 10646,
pp.1-13,
2024.
21
Young Jin Shin ، Farrokh Ebrahim ، Jaehoon Jung ، Jaewon Lee ، Hanbyul Kang, "A study of rotary cutting machine (RCM) performance on Korean Granite", Engineering Computations, 2023 Dec
vol. 0,
no. 0,
pp.1-35,
2023.
22
FATTAHI DEHKABOODI SHAHIN ، Farrokh Ebrahim ، Davood Lotfi, "Study of the effect of penetration depth and disc speed on cutting forces using LS-DYNA simulations", Amirkabir Journal of Civil Engineering, 2023 Dec
vol. 0,
no. 0,
pp.1-18,
2023.
23
MOHAMMADI DARIUSH ، SHAHRIAR KOUROSH ، MAAREFVAND PARVIZ ، Farrokh Ebrahim, "Discussion of cutterhead opening design for earth pressure balance machines (EPBMs)", Proceedings of The Institution of Civil Engineers-Geotechnical Engineering, 2023 Jun
vol. 0,
no. 0,
pp.1-15,
2023.
24
TARAFRAVA MOSTAFA ، Farrokh Ebrahim, "Estimation of the stability number and face pressure of the tunnel at the serviceability limit state based on the results of numerical modeling", Journal of Analytical and Numerical Methods In Mining Engineering, 2023 Apr
vol. 13,
no. 34,
pp.27-39,
2023.
25
Farrokh Ebrahim, "Slump value and consistency index relationship for the application of EPB TBMs", Arabian Journal of Geosciences, 2023 Mar
vol. 16,
no. 282,
pp.1-10,
2023.
26
Farrokh Ebrahim ، Davood Lotfi ، Rohullah Khorshid, "Lace design simulation for the layout optimization of rock cutterheads", Arabian Journal of Geosciences, 2023 Jan
vol. 16,
no. 123,
pp.1-20,
2023.
27
FATTAHI DEHKABOODI SHAHIN ، Farrokh Ebrahim ، Vahhab Sarfarazi, "Investigating the effect of changing the depth of penetration, contact area and speed of the cutting disc on the forces acting on the cutting disc with a V-shaped edge", Journal of Rock Mechanics, 2022 Dec
vol. 6,
no. 3,
pp.13-21,
2022.
28
Farrokh Ebrahim, "Design of cutterhead layout pattern for rock head micro-TBMs", Arabian Journal of Geosciences, 2022 Aug
vol. 15,
no. 1425,
pp.1-14,
2022.
29
Farrokh Ebrahim, "Using field data and operational constraints to maximize hard rock TBM penetration and advance rates", Tunnelling and Underground Space Technology, 2022 Apr
vol. 125,
no. 104506,
pp.1-18,
2022.
30
AMERI MILAD ، Farrokh Ebrahim ، MOLADAVOODI HAMED, "TBM penetration rate prediction using neural networks and neuro-fuzzy systems", Tunneling & Underground Space Engineering, 2022 Jan
vol. 10,
no. 1,
pp.35-56,
2022.
31
Farrokh Ebrahim, "Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration and TBM advance", Arabian Journal of Geosciences, 2021 Sep
vol. 14,
no. 2049,
pp.1-18,
2021.
32
Farrokh Ebrahim ، Alireza Amiri ، Asadollah Hasoomi, "Volume loss and face pressure evaluation in Tehran metro line 6, south extension", Tunnelling and Underground Space Technology, 2021 Jul
vol. 116,
no. 104113,
pp.1-16,
2021.
33
Farrokh Ebrahim, "Cutter change time and cutter consumption for rock TBMs", Tunnelling and Underground Space Technology, 2021 May
vol. 114,
no. 104000,
pp.1-15,
2021.
34
Farrokh Ebrahim, "Primary and secondary tools' life evaluation for soft ground TBMs", Bulletin of Engineering Geology and The Environment, 2021 Apr
vol. -,
no. 0,
pp.1-19,
2021.
35
Farrokh Ebrahim, "Construction time optimization for large underground excavations", , 2021 Mar
vol. 15,
no. 49,
pp.49-66,
2021.
36
Farrokh Ebrahim, "Uniformly distributed lace design for hard rock TBMs", Tunnelling and Underground Space Technology, 2021 Jan
vol. 110,
no. 103829,
pp.1-13,
2021.
37
Farrokh Ebrahim, "Lace Design Optimization for Hard Rock TBMs", Amirkabir Journal of Civil Engineering, 2020 Dec
vol. 0,
no. 0,
pp.1-22,
2020.
38
Farrokh Ebrahim, "Optimum design of the peripheral cutters' specification on the head profile for hard-rock TBMs", Tunnelling and Underground Space Technology, 2020 Oct
vol. 107,
no. 1,
pp.1-11,
2020.
39
Farrokh Ebrahim, "Positioning the Peripheral Cutters in Hard Rock TBMs", Tunneling & Underground Space Engineering, 2020 Sep
vol. 9,
no. 3,
pp.207-228,
2020.
40
Farrokh Ebrahim, "Force-Penetration Interaction Diagram for Hard Rock TBMs Performance Optimization", Amirkabir Journal of Civil Engineering, 2020 Sep
vol. 0,
no. 0,
,
2020.
41
Farrokh Ebrahim, "A Study of Cutter Life and Its Influential Factors in Ghomrud Water Conveyance Tunnel", Tunneling & Underground Space Engineering, 2020 Aug
vol. 9,
no. 2,
pp.163-181,
2020.
42
Farrokh Ebrahim, "Face Pressure Evaluation in Serviceability Limit State", Amirkabir Journal of Civil Engineering, 2020 Jun
vol. 0,
no. 0,
,
2020.
43
Farrokh Ebrahim, "A study of various models used in the estimation of advance rates for hard rock TBMs", Tunnelling and Underground Space Technology, 2020 Mar
vol. 97,
no. 103219,
pp.1-14,
2020.
44
Farrokh Ebrahim, "TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period", Journal of Mining and Environment, 2020 Mar
vol. 0,
no. 0,
,
2020.