1
H.A. Mousazadegan, S.M.T. Fatemi Ghomi, A. Afrazeh, "A novel approach to improve workforce skills in the multi-skilled project scheduling problem using the apprenticeship method", Computers and Industrial Engineering, 2025 Nov
vol. 211,
no. 0,
pp.1-12,
2025.
2
M. Fatehi, S.M.T. Fatemi Ghomi, H. Mosadegh, "A novel machine learning-based model for forecasting paint body storage entries in mixed-model assembly lines", Journal of Statistical Computation and Simulation, 2025 Oct
vol. 0,
no. 0,
pp.1-40,
2025.
3
A. Yavari, S.M.T. Fatemi Ghomi, Fariborz Jolai, "Augmented progressive hedging algorithm for a capacitated firm subject to demand and supply uncertainties considering discount", Rairo-Operations Research, 2025 Oct
vol. 59,
no. 5,
pp.3325-3346,
2025.
4
A. Azadi, S.M.T. Fatemi Ghomi, A. Ahmadi, A.M. Fathollahifard, "A robust optimization model for the supplier portfolio selection problem using a combination of artificial fish swarm algorithm and simulated annealing", Journal of Intelligent Manufacturing, 2025 Sep
vol. 0,
no. 0,
pp.1-25,
2025.
5
M. Khojaste Sarakhsi, H. Shahabi Haghighi, S.M.T. Fatemi Ghomi, "A 3D multi-modal multi-scale end-to-end classifier for Alzheimer's disease diagnosis", Medical Engineering and Physics, 2025 Sep
vol. 143,
no. 1,
pp.1-17,
2025.
6
A. Rasekh, S.M.T. Fatemi Ghomi, "Water-energy nexus approach for assessment of biodiesel production from jatropha via system dynamics modeling", Biofuels-Uk, 2025 Aug
vol. 0,
no. 0,
pp.1-19,
2025.
7
M. Khojaste Sarakhsi, S.M.T. Fatemi Ghomi, H.dashtaki-hesari, "Forecasting and Comparative Analysis of Energy Consumption in Iran and the United States: Divergent Trends and Policy Insights", Journal of Industrial and Systems Engineering, 2025 Aug
vol. 17,
no. 2,
pp.81-102,
2025.
8
Javad Behnamian, S.M.T. Fatemi Ghomi, B. Karimi, M. Fadaei Moloudi, "Capacitated lot-sizing and production sequence problem with setups complexity", Scientia Iranica, 2025 Jun
vol. 32,
no. 4,
pp.-,
2025.
9
S. Sadri, S.M.T. Fatemi Ghomi, "Evaluating time-cost trade-off in a resource constraint GERT-type project scheduling problem considering rework", International Journal of Systems Science-Operations & Logistics, 2024 Nov
vol. 11,
no. 1,
,
2024.
10
M. Hemmati, S.M.T. Fatemi Ghomi, Hongyan Li, "Pricing and bundling decisions for complementary products in an agency selling platform with risk-averse suppliers and stochastic demand stochastic demand", International Transactions In Operational Research, 2024 Oct
vol. 0,
no. 0,
pp.1-39,
2024.
11
F. Souri, S.M.T. Fatemi Ghomi, "Design of sustainable perishable food supply chain network under uncertainty", Opsearch, 2024 Aug
vol. 0,
no. 0,
,
2024.
12
M. Khojaste Sarakhsi, H. Shahabi Haghighi, S.M.T. Fatemi Ghomi, Elena Marchiori, "A 3D multi-scale CycleGAN framework for generating synthetic PETs from MRIs for Alzheimer's disease diagnosis", Image and Vision Computing, 2024 Apr
vol. 146,
no. 1,
pp.1-17,
2024.
13
S. Sadri, S.M.T. Fatemi Ghomi, Amin Dehghanian, "Analysis of a time-cost trade-offs in a resource-constrained GERT project scheduling problem using the Markov decision process", Annals of Operations Research, 2024 Mar
vol. 0,
no. 0,
,
2024.
14
A. Yavari, S.M.T. Fatemi Ghomi, Fariborz Jolai, "Development of multi-period, multi-product model to mitigate supply risk with capacity constraint and discount", Opsearch, 2024 Mar
vol. 0,
no. 0,
,
2024.
15
M. Hemmati, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "The impact of advertising and product quality on sales mode choice in the presence of private label", International Journal of Production Economics, 2024 Feb
vol. 269,
no. 0,
pp.109164-0,
2024.
16
M. Hemmati, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Optimal bidding in a participative mechanism with bundling and rebidding options", Journal of Industrial and Systems Engineering, 2023 Nov
vol. 15,
no. 1,
pp.328-350,
2023.
17
E. Arabzadeh, S.M.T. Fatemi Ghomi, B. Karimi, "Multi-period home health care routing and scheduling problem with the medical grouping of patients", Scientia Iranica, 2023 Oct
vol. 30,
no. 5,
pp.1781-1795,
2023.
18
N. Salmanzadeh Meydani, S.M.T. Fatemi Ghomi, H. Shahabi Haghighi, Kannan Govindan, "Sudden -outset disaster resilience considering functionality improvement planning: An upstream oil and gas company", Journal of Loss Prevention In The Process Industries, 2023 Feb
vol. 81,
no. 0,
,
2023.
19
Erfan Shafiee Roudbari, S.M.T. Fatemi Ghomi, Ursula Eicker, "Designing a multi-objective closed-loop supply chain: a two-stage stochastic programming, method applied to the garment industry in Montreal, Canada", Environment Development and Sustainability, 2023 Feb
vol. 0,
no. 0,
,
2023.
20
H. Bakhshi Khaniki, S.M.T. Fatemi Ghomi, "Integrated dynamic cellular manufacturing systems and hierarchical production planning with worker assignment and stochastic demand", International Journal of Engineering, 2023 Feb
vol. 36,
no. 2,
pp.348-359,
2023.
21
M. Hemmati, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Separate and bundling selling strategies for complementary products in a participative pricing mechanism", Computers and Industrial Engineering, 2023 Jan
vol. 177,
no. 0,
,
2023.
22
M.shojaee, S.jafarian-namin, S.M.T. Fatemi Ghomi, D.m.imani, A.faraz, M.s.fallahnezhad, "Applying SVSSI sampling scheme to np-chart to decrease the time of detecting shifts using Markov chain approach and Monte Carlo simulation", Scientia Iranica, 2022 Dec
vol. 29,
no. 6,
pp.3369-3387,
2022.
23
S.M.T. Fatemi Ghomi, B. Askarian, "0", , 2022 Dec
vol. 24,
no. 75,
pp.1-12,
2022.
24
F. Radan, S.M.T. Fatemi Ghomi, S.M.J. Mirzapour Alehashem, Moeen Sammak Jalali, "Maritime inventory routing problem considering weather conditions and tide at ports", Transportation Research Record, 2022 Nov
vol. 0,
no. 0,
,
2022.
25
M. Khojaste Sarakhsi, H. Shahabi Haghighi, S.M.T. Fatemi Ghomi, Elena Marchiori, "Deep learning for Alzheimers disease diagnosis: A survey", Artificial Intelligence In Medicine, 2022 Jun
vol. 130,
no. 130,
,
2022.
26
Mohammad Mirabi, S.M.T. Fatemi Ghomi, Fariborz Jolai, "Hybrid genetic algorithm for the economic-statistical design of variable sample size and sampling interval x-bar control chart", Journal of Industrial Engineering and Management Studies, 2022 Apr
vol. 8,
no. 2,
pp.160-174,
2022.
27
N. Salmanzadeh Meydani, S.M.T. Fatemi Ghomi, H. Shahabi Haghighi, Kannan Govindan, "A multivariate quantitative approach for sustainability performance assessment: An upstream oil and gas company", Environment Development and Sustainability, 2022 Feb
vol. 0,
no. 0,
,
2022.
28
M. Hemmati, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "A multi-echelon supply chain of deteriorating items with stock-and price-sensitive demand under consignment stock policy", Engineering Optimization, 2022 Jan
vol. 0,
no. 0,
,
2022.
29
M. Jenabi, S.M.T. Fatemi Ghomi, S.a.torabi, M. Sammak Jalali, "An accelerated Benders decomposition algorithm for stochastic power system expansion planning using sample average approximation", Opsearch, 2021 Nov
vol. 0,
no. 0,
,
2021.
30
E. Shafiee Roudbari, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Reverse logistics network design for product reuse, remanufacturing, recycling and refurbishing under uncertainty", Journal of Manufacturing Systems, 2021 Jul
vol. 60,
no. 0,
pp.473-486,
2021.
31
M. Gharib, S.M.T. Fatemi Ghomi, Fariborz Jolai, "A multi-objective stochastic programming model for post-disaster management", Transportmetrica A-Transport Science, 2021 May
vol. 0,
no. 0,
,
2021.
32
M. Hemmati, S.M.J. Mirzapour Alehashem, S.M.T. Fatemi Ghomi, "Heuristic analyses of separate and bundling sales for complimentary products under consignment stock policy", Computers and Industrial Engineering, 2021 Apr
vol. 0,
no. 0,
,
2021.
33
Samrad Jafarian-namin, S.M.T. Fatemi Ghomi, Mohsen Shojaie, Saeed Shavvalpour, "Annual forecasting of inflation rate in Iran: Autoregressive integrated moving average modeling approach", Engineering Reports, 2021 Apr
vol. 3:e12344,
no. 0,
pp.1-11,
2021.
34
S.a.lesany, S.M.T. Fatemi Ghomi, "Extraction and organization of statistical distribution function for simulation of variations and patterns in the variability control charts", Journal of Statistical Computation and Simulation, 2021 Mar
vol. 0,
no. 0,
,
2021.
35
Javad Behnamian, S.M.T. Fatemi Ghomi, "MULTI-OBJECTIVE MULTI-FACTORY SCHEDULING", Rairo-Operations Research, 2021 Mar
vol. 55,
no. 0,
pp.1447-1467,
2021.
36
K. Forghani, S.M.T. Fatemi Ghomi, Reza Kia, "Group layout design of manufacturing cells incorporating assembly and energy aspects", Engineering Optimization, 2021 Mar
vol. 0,
no. 0,
,
2021.
37
Samrad Jafarian-namin, Mohammad Saber Fallahnezhad, Reza Tavakoli-moghaddam, Ali Salmasnia, S.M.T. Fatemi Ghomi, "An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart", Journal of Statistical Computation and Simulation, 2021 Mar
vol. 0,
no. 0,
,
2021.
38
K. Forghani, S.M.T. Fatemi Ghomi, Reza Kia, "Concurrent scheduling and layout of virtual manufacturing cells considering assembly aspects", Proceedings of The Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture, 2020 Dec
vol. 0,
no. 0,
pp.1-14,
2020.
39
K. Alamatsaz, S.M.T. Fatemi Ghomi, Mehdi Iranpoor, "Minimal covering unrestricted location of obnoxious facilities:bi-objective formulation and a case study", Opsearch, 2020 Nov
vol. 0,
no. 0,
,
2020.
40
S. Rahmanzadeh, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Cross dock scheduling under multi-period condition", Journal of Industrial and Systems Engineering, 2020 Nov
vol. 12,
no. 4,
pp.208-226,
2020.
41
S.M.T. Fatemi Ghomi, M. Gharib, Fariborz Jolai, "A dynamic dispatching problem to allocate relief vehicles after a disaster", Engineering Optimization, 2020 Nov
vol. 0,
no. 0,
pp.1-18,
2020.
42
S.M.T. Fatemi Ghomi, B. Karimi, Javad Behnamian, J. Firoozbakht, "A multi-objective particle swarm optimization based on pareto archive for integrated production and distribution planning in a green supply chain", Applied Artificial Intelligence, 2020 Nov
vol. 0,
no. 0,
,
2020.
43
K. Forghani, S.M.T. Fatemi Ghomi, "Joint cell formation,cell scheduling,and group layout problem in virtual and classical celluar manufacturing systems", Applied Soft Computing, 2020 Sep
vol. 0,
no. 0,
,
2020.
44
E. Shafiee Roudbari, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Network design for multi echelon reverse logistics and solving with hybrid algorithm", , 2020 Sep
vol. 8,
no. 16,
pp.185-197,
2020.
45
M. Sammak Jalali, S.M.T. Fatemi Ghomi, Masoud Rabbani, "A graph-based decision support system for analyzing hybrid make-to-stock/make-to-order manufacturing environments", Brazilian Journal of Operations & Production Management, 2020 Apr
vol. 17,
no. 1,
,
2020.
46
K. Forghani, S.M.T. Fatemi Ghomi, Reza Kia, "Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming", Soft Computing, 2020 Jan
vol. 0,
no. 0,
,
2020.
47
Mehdi Iranpoor, S.M.T. Fatemi Ghomi, "Periodic flexible maintenance planning in a single-machine production environment", Journal of Industrial Engineering International, 2019 Nov
vol. 15,
no. 4,
pp.627-635,
2019.
48
K. Forghani, S.M.T. Fatemi Ghomi, "Cellular Manufacturing Scheduling in the Presence of Multiple Process Routings and Considering Job Splitting", Economic Computation and Economic Cybernetics Studies and Research, 2019 Oct
vol. 53,
no. 2,
pp.271-288,
2019.
49
H. Mosadegh, S.M.T. Fatemi Ghomi, G.a.suer, "Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristic", European Journal of Operational Research, 2019 Sep
vol. 0,
no. 0,
,
2019.
50
K. Forghani, S.M.T. Fatemi Ghomi, "A queuing theory-based approach to designing cellular manufacturing systems", Scientia Iranica, 2019 Jul
vol. 26,
no. 3,
pp.1865-1880,
2019.
51
N. Salmanzadeh Meydani, S.M.T. Fatemi Ghomi, "The causal relationship among electricity consumption,economic growth and capital stock in Iran", Journal of Policy Modeling, 2019 Jun
vol. 0,
no. 0,
,
2019.
52
F. Marandi, S.M.T. Fatemi Ghomi, "Network configuration multi-factory scheduling with batch delivery: A learning-oriented simulated annealing approach", Computers and Industrial Engineering, 2019 May
vol. 132,
no. 0,
pp.293-310,
2019.
53
Mehdi Iranpoor, S.M.T. Fatemi Ghomi, "Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability", Journal of Optimization In Industrial Engineering, 2019 Jan
vol. 12,
no. 1,
pp.1-13,
2019.
54
M. Ebrahimi Vostakolaei, S.M.T. Fatemi Ghomi, B. Karimi, "APPLICATION OF THE PREVENTIVE MAINTENANCE SCHEDULING TO INCREASE THE EQUIPMENT RELIABILITY: CASE STUDY- BAG FILTERS IN CEMENT FACTORY", Journal of Industrial and Management Optimization, 2019 Jan
vol. 0,
no. 0,
,
2019.
55
S.M.T. Fatemi Ghomi, F. Sogandi, "A two-sided Bernoulli-based CUSUM control chart with autocorrelated observations", Journal of Industrial Engineering International, 2018 Dec
vol. 15,
no. 0,
pp.287-292,
2018.
56
M. Khojaste Sarakhsi, S. Ghodsypour, S.M.T. Fatemi Ghomi, H.dashtaki-hesari, "Energy efficiency of Iran Building: a SWOT-ANP approach", International Journal of Energy Sector Management, 2018 Dec
vol. 0,
no. 0,
,
2018.
57
M. Hashem-nazari, A. Esfahanipour, S.M.T. Fatemi Ghomi, "A basic form'-focused modeling and a modified parameter estimation technique for grey prediction models", Scientia Iranica, 2018 Oct
vol. 25,
no. 5,
pp.2867-2880,
2018.
58
S.M.T. Fatemi Ghomi, B. Askarian, "Development of metaheuristics to solve a transportation inventory location routing problem considering lost sale for perishable goods", Journal of Modelling In Management, 2018 Oct
vol. 0,
no. 0,
,
2018.
59
M. Hemmati, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Inventory of complementary products with srtock-dependent demand under vendor-managed inventory with consignmeent policy", Scientia Iranica, 2018 Sep
vol. 25,
no. 4,
pp.2347-2360,
2018.
60
F. Marandi, S.M.T. Fatemi Ghomi, "Integrated multi-factory production and distribution scheduling applying vehicle routing approach", International Journal of Production Research, 2018 Jul
vol. 0,
no. 0,
,
2018.
61
J. Behnanamian, S.M.T. Fatemi Ghomi, F. Jolai, M. Telgerdi, "Optimal design of cross docking supply chain networks with time-varying uncertain demands", Journal of Industrial and Systems Engineering, 2018 Apr
vol. 11,
no. 2,
pp.1-20,
2018.
62
M. Sammak Jalali, S.M.T. Fatemi Ghomi, "Demand Forecasting in Hybrid MTS/MTO Production Systems", International Journal of Applied Industrial Engineering, 2018 Mar
vol. 5,
no. 1,
pp.63-78,
2018.
63
Javad Behnamian, S.M.T. Fatemi Ghomi, Fariborz Jolai, P. Heidari, "Location-Allocation and Scheduling of Inbound and Outbound Trucks in Multiple Cross-Dockings Considering Breakdown Trucks", Journal of Optimization In Industrial Engineering, 2018 Jan
vol. 1,
no. 0,
pp.51-65,
2018.
64
M. Sammak Jalali, S.M.T. Fatemi Ghomi, Masoud Rabbani, "A system dynamics approach towards analysis of hybrid make-to-stock/make-to-order production systems", Industrial Engineering and Management Systems, 2018 Jan
vol. 19,
no. 1,
pp.143-163,
2018.
65
S.a.lesany, S.M.T. Fatemi Ghomi, A.koochakzadeh, "Development of fitted line and fitted cosine curve for recognition and analysis of unnatural patterns in process control charts", Pattern Analysis and Applications, 2018 Jan
vol. 0,
no. 0,
,
2018.
66
S. Torkaman, S.M.T. Fatemi Ghomi, B. Karimi, "Hybrid simulated annealing and genetic approach for solving a multi-stage production planning with sequence-dependent setups in a closed-loop supply chain", Applied Soft Computing, 2017 Nov
vol. 0,
no. 0,
,
2017.
67
S. Torkaman, S.M.T. Fatemi Ghomi, B. Karimi, "Multi-stage multi-product multi-period production planning with sequence-dependent setups in closed -loop supply chain", Computers and Industrial Engineering, 2017 Oct
vol. 113,
no. 0,
pp.602-613,
2017.
68
R. Maihami, B. Karimi, S.M.T. Fatemi Ghomi, "Pricing and Inventory Control in a Supply Chain of Deteriorating Items: A Non-cooperative Strategy with Probabilistic Parameters", International Journal of Applied and Computational Mathematics, 2017 Sep
vol. 3,
no. 3,
pp.2477-2499,
2017.
69
H. Mosadegh, S.M.T. Fatemi Ghomi, G.a.suer, "A control theoretical modelling for velocity tuning of the conveyor belt in a dynamic mixed-model assembly line", International Journal of Production Research, 2017 Sep
vol. 0,
no. 0,
,
2017.
70
Hassan Hosseini-nasab, Sepideh Fereidouni, S.M.T. Fatemi Ghomi, Mohammad Bagher Fakhzad, "Classification of facility layout problems: a review study", International Journal of Advanced Manufacturing Technology, 2017 Aug
vol. 0,
no. 0,
,
2017.
71
M. Hashem-nazari, A. Esfahanipour, S.M.T. Fatemi Ghomi, "Non-Equidistant Basic Form'-Focused Grey Verhulst Models (NBFGVMS) For Ill-Structured Socio-Economic Forecasting Problems", Journal of Business Economics and Management, 2017 Aug
vol. 18,
no. 4,
pp.676-694,
2017.
72
M.haghi, S.M.T. Fatemi Ghomi, P. Hoosangitabrizi, "A novel deterministic model for simultaneous weekly assignment and scheduling decision-making in operating theaters", Scientia Iranica, 2017 Aug
vol. 24,
no. 4,
pp.2035-2049,
2017.
73
H. Badri, S.M.T. Fatemi Ghomi, T. Hejazi, "A two-stage stochastic programming approach for value-based closed-loop supply chain network desing", Transportation Research Part E-Logistics and Transportation Review, 2017 Jul
vol. 105,
no. 0,
pp.1-17,
2017.
74
M. Haghi, S.M.T. Fatemi Ghomi, F. Jolai, "Developing a robust multi-objective model for pre / post disaster times under uncertainty in demand and resource", Journal of Cleaner Production, 2017 Apr
vol. 154,
no. 0,
pp.188-202,
2017.
75
J. Behnanamian, S.M.T. Fatemi Ghomi, B. Karimi, M. Fadaei Moloudi, "A Markovian approach for multi-level multi-product multi-period capacitated lot-sizing problem with uncertainty in levels", International Journal of Production Research, 2017 Apr
vol. 0,
no. 0,
,
2017.
76
A. Kamali, S.M.T. Fatemi Ghomi, F. Jolai, "Modeling and optimization of the multi-objective single-buyer multi-vendor integrated inventory problem with multiple quantity discounts", Scientia Iranica, 2017 Apr
vol. 24,
no. 2,
pp.856-867,
2017.
77
M. Hemmati, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Vendor managed inventory with consignment stock for supply chain with stock-and price-dependent demand", International Journal of Production Research, 2017 Feb
vol. 0,
no. 0,
,
2017.
78
E. Arabzadeh, S.M.T. Fatemi Ghomi, B. Karimi, "A new mathematical model for multi period multi depot home health care routing scheduling problem", Nursing Practice Today, 2016 Dec
vol. 3,
no. 4,
pp.140-151,
2016.
79
H. Mosadegh, S.M.T. Fatemi Ghomi, G.a. Ser, "Heuristic approaches for mixed-model sequencing problem with stochastic processing times", International Journal of Production Research, 2016 Aug
vol. 0,
no. 0,
,
2016.
80
A. Khorshidian, M. Akbarpour Shirazi, S.M.T. Fatemi Ghomi, "An intelligent truck scheduling and transportation planning optimization model for product portfolio in a cross-dock", Journal of Intelligent Manufacturing, 2016 Jun
vol. 0,
no. 0,
,
2016.
81
S.M.T. Fatemi Ghomi, M. Khojaste Sarakhsi, B. Karimi, "Joint economic lot-sizing problem for a two-stage supply chain with price-sensitive demand", Scientia Iranica, 2016 Jun
vol. 23,
no. 3,
pp.1474-1487,
2016.
82
R. Maihami, B. Karimi, S.M.T. Fatemi Ghomi, "Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions", Annals of Operations Research, 2016 Apr
vol. 0,
no. 0,
,
2016.
83
R. Mohammadi, S.M.T. Fatemi Ghomi, F. Jolai, "Prepositioning emergency earthquake response supplies: A new multi-objective particle swarm optimization algorithm", Applied Mathematical Modelling, 2016 Mar
vol. 0,
no. 0,
pp.1-17,
2016.
84
H. Badri, S.M.T. Fatemi Ghomi, T.h.hejazi, "A two-stage stochastic programming model for value-based supply chain network design", Scientia Iranica, 2016 Mar
vol. 23,
no. 1,
pp.348-360,
2016.
85
S. Rahmanzadeh, S.M.T. Fatemi Ghomi, M. Sheikh Sajadieh, "Cross dock scheduling with fixed outbound trucks departure times under substitution condition", Computers and Industrial Engineering, 2016 Jan
vol. 92,
no. 0,
pp.50-56,
2016.
86
M. Khojaste Sarakhsi, S.M.T. Fatemi Ghomi, B. Karimi, "A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem", Journal of Computational and Applied Mathematics, 2016 Jan
vol. 292,
no. 0,
pp.387-401,
2016.
87
M. Hajian Heidary, S.M.T. Fatemi Ghomi, B. Karimi, "Supply chain network design for deteriorating items with discount on transportation cost", Scientia Iranica, 2015 Dec
vol. 22,
no. 6,
pp.2634-2643,
2015.
88
S.a.jenabi, S.M.T. Fatemi Ghomi, S..a.torabi, S. Hosseinian, "Acceleration strategies of Benders decomposition for the security constraints power system expansion planning", Annals of Operations Research, 2015 Sep
vol. 0,
no. 0,
,
2015.
89
N. Hamta, M. Akbarpour Shirazi, Sara Behdad, S.M.T. Fatemi Ghomi, "Modeling and Measuring the structural complexity in assembly supply chain networks", Journal of Intelligent Manufacturing, 2015 Jul
vol. 0,
no. 0,
,
2015.
90
Mahdi Karimi, Milad Azizi, Hassan Javanshir, S.M.T. Fatemi Ghomi, "A hybrid approach based on SERVQUAL and fuzzy TOPSIS for evaluating banking service quality", Decision Science Letters, 2015 Apr
vol. 4,
no. 0,
pp.349-362,
2015.
91
R. Jamshidi, S.M.T. Fatemi Ghomi, B. Karimi, "Flexible supply chain optimization with controllable lead time and shipping option", Applied Soft Computing, 2015 Feb
vol. 30,
no. 0,
pp.26-35,
2015.
92
N. Hamta, M. Akbarpour Shirazi, S.M.T. Fatemi Ghomi, "A bi-level programming model for supply chain network optimization with assembly line balancing and push-pull strategy", Proceedings of The Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture, 2015 Feb
vol. 0,
no. 0,
pp.1-17,
2015.
93
Abbas Raad, S.M.T. Fatemi Ghomi, F. Jolai, Hasan Farsijani, Gazaleh Sadidi, "Transportation cost in multi-item economic order quantity", International Journal of Business Management and Administration, 2015 Feb
vol. 4,
no. 1,
pp.8-16,
2015.
94
J. Behnanamian, S.M.T. Fatemi Ghomi, "Minimizing cost-related objective in synchronous scheduling of parallel factories in the virtual production network", Applied Soft Computing, 2015 Jan
vol. 29,
no. 0,
pp.221-232,
2015.
95
N. Hamta, M. Akbarpour Shirazi, S.M.T. Fatemi Ghomi, Sara Behdad, "Supply chain network optimization considering assembly line balancing and demand uncertainty", International Journal of Production Research, 2014 Nov
vol. 0,
no. 0,
,
2014.
96
J. Behnamian, S.M.T. Fatemi Ghomi, M.zandieh, "Realistic variant of just-in-time flowshop scheduling: integration of Lp-metric method in PSO-like algorithm", International Journal of Advanced Manufacturing Technology, 2014 Sep
vol. 74,
no. 0,
,
2014.
97
S. Shahinmoghadam, S.M.T. Fatemi Ghomi, B. Karimi, "Vehicle routing scheduling problem with cross docking and split deliveries", Computers and Chemical Engineering, 2014 Aug
vol. 69,
no. 0,
pp.98-107,
2014.
98
R. Mohammadi, S.M.T. Fatemi Ghomi, F. Zeinali, "A new hybrid evolutionary based RBF networks method for forecasting time series: A case study of forecasting emergency supply demand time series", Engineering Applications of Artificial Intelligence, 2014 Aug
vol. 36,
no. 0,
pp.204-214,
2014.
99
N. Hamta, S.M.T. Fatemi Ghomi, R.tavakkoli-moghaddam, F.jolai, "A hybrid meta-heuristic for balancing and scheduling assembly lines with sequence-independent setup times by considering deteriorating tasks and learning effect", Scientia Iranica, 2014 Jul
vol. 21,
no. 3,
pp.963-979,
2014.
100
A. Raad, S. Mansour, , S.M.T. Fatemi Ghomi, "A Decision Making Method for Product End of Life Management (A case study in Iran", Advances In Environmental Biology, 2014 Jun
vol. 8,
no. 10,
pp.801-811,
2014.
101
M. Hajiaghaeikeshteli, M. Amin Nayeri, S.M.T. Fatemi Ghomi, "Integrated scheduling of production and rail transportation", Computers and Industrial Engineering, 2014 Jun
vol. 74,
no. 0,
pp.240-256,
2014.
102
J. Behnamian, S.M.T. Fatemi Ghomi, B. Karimi, M. Fadaei Moloudi, "An iterative method for forecasting most probable point of stochastic demand", Journal of Industrial Engineering International, 2014 May
vol. 64,
no. 10,
,
2014.
103
M.mirabi, S.M.T. Fatemi Ghomi, F. Jolai, "A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem", Journal of Industrial Engineering International, 2014 Apr
vol. 57,
no. 10,
,
2014.
104
J. Behnanamian, S.M.T. Fatemi Ghomi, "Multi-objective fuzzy multiprocessor flowshop scheduling", Applied Soft Computing, 2014 Apr
vol. 21,
no. 0,
pp.139-148,
2014.
105
J. Behnanamian, S.M.T. Fatemi Ghomi, "A survey of multi-factory scheduling", Journal of Intelligent Manufacturing, 2014 Mar
vol. 0,
no. 0,
,
2014.
106
M. Hajian Heidary, S.M.T. Fatemi Ghomi, B. Karimi, "-", , 2014 Mar
vol. 0,
no. 42,
pp.18-25,
2014.
107
F. Kafi, S.M.T. Fatemi Ghomi, "-", , 2014 Mar
vol. 0,
no. 2,
pp.123-137,
2014.
108
F. Kafi, S.M.T. Fatemi Ghomi, "A Game-Theoretic Model to Analyze Value Creation with Simultaneous Cooperation and Competition of Supply Chain Partners", Mathematical Problems In Engineering, 2014 Mar
vol. 2014,
no. 754038,
pp.1-10,
2014.
109
M.r.gholamian, S.M.T. Fatemi Ghomi, M.ghazanfari, "Applying FARSJUM intelligent system to derive priorities in sparse hierarchical problems", Soft Computing, 2014 Feb
vol. 18,
no. 0,
pp.299-311,
2014.
110
M.s.fatemi Ghomi, H. Javanshir, S. S. Ganji, S.M.T. Fatemi Ghomi, "Optimisation of yard crane scheduling considering velocity coefficient and preventive maintenance", International Journal of Shipping and Transport Logistics, 2014 Feb
vol. 6,
no. 1,
pp.88-108,
2014.
111
R. Ghasemy Yaghin, S.M.T. Fatemi Ghomi, S.a.torabi, "Enhanced joint pricing and lotsizing problem in a two-echelon supply chain with logit demand function", International Journal of Production Research, 2014 Feb
vol. 0,
no. 0,
,
2014.
112
Javad Navaei, S.M.T. Fatemi Ghomi, Fariborz Jolai, Ashkan Mozdgir, "Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs", Computers and Operations Research, 2014 Jan
vol. 44,
no. 0,
pp.52-65,
2014.
113
R. Ghasemy Yaghin, S.M.T. Fatemi Ghomi, S.a.torabi, "A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration", International Journal of Systems Science, 2014 Jan
vol. 0,
no. 0,
,
2014.
114
S. Hosseini, M. Akbarpour Shirazi, S.M.T. Fatemi Ghomi, "Harmony search optimization algorithm for a novel transportation problem in a consolidation network", Engineering Optimization, 2013 Dec
vol. 0,
no. 0,
,
2013.
115
S.M.T. Fatemi Ghomi, S. Jaberi, M. Hajian Heidary, "Development of a multiobjective optimization model of fuzzy reliability and its solution applying simulated annealing algorithm", , 2013 Dec
vol. 2,
no. 3,
pp.133-194,
2013.
116
Ashkan Mozdgir, S.M.T. Fatemi Ghomi, F.jolai, Javad Navaei, "Three meta-heuristics to solve the no-wait two-stage assembly flow-shop scheduling problem", Scientia Iranica, 2013 Dec
vol. 20,
no. 6,
pp.2275-2283,
2013.
117
M. Iranpoor, S.M.T. Fatemi Ghomi, M.zandieh, "Order acceptance and due-date quotation in low machine rates", Applied Mathematical Modelling, 2013 Dec
vol. 0,
no. 0,
,
2013.
118
M. Ebrahimi Vostakolaei, S.M.T. Fatemi Ghomi, B. Karimi, "Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates", Applied Mathematical Modelling, 2013 Dec
vol. 0,
no. 0,
,
2013.
119
M. Morady Gohareh, N. Shams Gharneh, S.M.T. Fatemi Ghomi, "Cash management in single and parallel machine scheduling", International Journal of Production Research, 2013 Nov
vol. online,
no. 0,
,
2013.
120
S. Shahinmoghadam, S.M.T. Fatemi Ghomi, B. Karimi, "Vehicle Routing with Cross Docking and Split Deliveries", , 2013 Nov
vol. 15,
no. 41,
pp.14-23,
2013.
121
S.a.lesany, A.koochakzadeh, S.M.T. Fatemi Ghomi, "Recognition and classification of single and concurrent unnatural patterns in control charts via neural networks and fitted line of samples", International Journal of Production Research, 2013 Sep
vol. 0,
no. 0,
,
2013.
122
M.babaei, M.mohammadi, S.M.T. Fatemi Ghomi, M.a.sobhanallahi, "Solving Multi-level, Multi-product and Multi-period Lot Sizing and Scheduling Problem in Permutation Flow Shop", International Journal of Science and Engineering Applications, 2013 Aug
vol. 2,
no. 6,
pp.130-140,
2013.
123
S. Rahmanzadeh, M. Akbarpour Shirazi, S.M.T. Fatemi Ghomi, S. Hosseini, "Truck capacity analysis in a cross-dock transportation network considering direct shipment", Journal of Advanced Transportation, 2013 Aug
vol. 0,
no. 0,
,
2013.
124
M.babaei, M.mohammadi, S.M.T. Fatemi Ghomi, "A genetic algorithm for the simultaneous lot sizing and scheduling problem in capacitated flow shop with complex setups and backlogging", International Journal of Advanced Manufacturing Technology, 2013 Aug
vol. 68,
no. 0,
,
2013.
125
J.behnamian, S.M.T. Fatemi Ghomi, "Hybrid hyper PSO algorithm for the distributed factories scheduling with virtual corporation", , 2013 Jul
vol. 1,
no. 1,
pp.1-11,
2013.
126
J.navaei, S.M.T. Fatemi Ghomi, F.jolai, M. E. Shiraqai, H. Hidaji, "Two-stage flow-shop scheduling problem with non-identical second stage assembly machines", International Journal of Advanced Manufacturing Technology, 2013 Jul
vol. 67,
no. 0,
,
2013.
127
M. Jenabi, S.M.T. Fatemi Ghomi, Yves Smeers, "Bi-level Game Approaches for Coordination of Generation and Transmission Expansion Planning Within a Market Environment", Ieee Transactions On Power Systems, 2013 Jun
vol. 0,
no. 0,
,
2013.
128
Abbas Saghaei, S.M.T. Fatemi Ghomi, S. Jaberi, "Economic Design of Exponentially Weighted Moving Average Control Chart Based on Measurement Error Using Genetic Algorithm", Quality and Reliability Engineering International, 2013 Jun
vol. 0,
no. 0,
,
2013.
129
S.M.T. Fatemi Ghomi, M. Asady Baghlony, "Development of a structural model for system performance of an aircraft agency with queuing theory approach", Industrial Engineering & Management Sharif, 2013 Apr
vol. 1-28,
no. 2,
pp.141-146,
2013.
130
M. Mahnam, Ghasem Moslehi, S.M.T. Fatemi Ghomi, "Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness", Mathematical and Computer Modelling, 2013 Mar
vol. 0,
no. 0,
,
2013.
131
A.mozdgir, S.M.T. Fatemi Ghomi, F.jolai, J.navaei, "Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times", International Journal of Production Research, 2013 Mar
vol. 0,
no. 0,
,
2013.
132
M. Iranpoor, S.M.T. Fatemi Ghomi, M.zandieh, "Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times", Computers and Operations Research, 2013 Jan
vol. 40,
no. 0,
pp.1100-1108,
2013.
133
H.moheb Alizadeh, A.r.arshadi Khamseh, S.M.T. Fatemi Ghomi, "Fuzzy hypothesis testing with vague data using likelihood ratio test", Soft Computing, 2013 Jan
vol. 0,
no. 0,
,
2013.
134
M. Jenabi, S.M.T. Fatemi Ghomi, S.a.torabi, S. Hosseinian, "A Benders decomposition algorithm for a multi-area, multi-stage integrated resource planning in power systems", Journal of The Operational Research Society, 2012 Dec
vol. 0,
no. 0,
pp.1-19,
2012.
135
M. Pazoki, S.M.T. Fatemi Ghomi, F.jolai, "A multiproduct dynamic model to design a converge-diverge supply network with supplier partnership consideration", Scientia Iranica, 2012 Dec
vol. 0,
no. 0,
,
2012.
136
R. Ghasemy Yaghin, S.M.T. Fatemi Ghomi, S.a.torabi, "A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes", Fuzzy Sets and Systems, 2012 Dec
vol. 0,
no. 0,
,
2012.
137
M. Mahnam, S.M.T. Fatemi Ghomi, "A particle swarm optimization algorithm for forecasting based on time variation fuzzy time series", International Journal of Industrial Engineering and Production Research, 2012 Dec
vol. 23,
no. 4,
pp.269-276,
2012.
138
Seyed Saeid Hashemin, S.M.T. Fatemi Ghomi, "Constrained consumable resource allocation in alternative stochastic networks via multi-objective decision making", Journal of Industrial Engineering International, 2012 Sep
vol. 8,
no. 18,
pp.1-9,
2012.
139
Ali Naimi Sadigh, Hadi Mokhtari, M. Iranpoor, S.M.T. Fatemi Ghomi, "Cardinality Constrained Portfolio Optimization Using a Hybrid Approach based on Particle Swarm Optimization and Hopfield Neural Network", Advanced Science Letters, 2012 Aug
vol. 5,
no. 0,
pp.1-10,
2012.
140
R. Jamshidi, S.M.T. Fatemi Ghomi, B. Karimi, "Multi-objective green supply chain optimization with a new hybrid memetic algorithm using the Taguchi method", Scientia Iranica, 2012 Aug
vol. 0,
no. 0,
,
2012.
141
J. Behnamian, S.M.T. Fatemi Ghomi, "The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine", Information Sciences, 2012 Aug
vol. 0,
no. 0,
,
2012.
142
M.babaei, M.mohammadi, S.M.T. Fatemi Ghomi, M.a.sobhanallahi, "Two parametric-tuned metaheuristic algorithms for the multi-level lot sizing and scheduling problem", International Journal of Industrial Engineering Computations, 2012 Aug
vol. 3,
no. 0,
pp.751-766,
2012.
143
S.s.hashemin, S.M.T. Fatemi Ghomi, M.modarres, "Optimal constrained non-renewable resource allocation in PERT networks with discrete activity times", Scientia Iranica, 2012 May
vol. 0,
no. 0,
,
2012.
144
J. Behnamian, S.M.T. Fatemi Ghomi, "Incorporating transportation time in multi-agent production network scheduling", International Journal of Computer Integrated Manufacturing, 2012 May
vol. 0,
no. 0,
pp.1-18,
2012.
145
N. Hamta, S.M.T. Fatemi Ghomi, F..jolai, M. Akbarpour Shirazi, "A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect", International Journal of Production Economics, 2012 Apr
vol. 0,
no. 0,
,
2012.
146
M. Khadivi Borojeni, S.M.T. Fatemi Ghomi, "Solid waste facilities location using of analytical network process and data envelopment analysis approaches", Waste Management, 2012 Mar
vol. 0,
no. 0,
,
2012.
147
R. Ghasemy Yaghin, S. A.torabi, S.M.T. Fatemi Ghomi, "Integrated markdown pricing and aggregate production planning in a two echelon supply chain: A hybrid fuzzy multiple objective approach", Applied Mathematical Modelling, 2012 Feb
vol. 0,
no. 0,
,
2012.
148
M. Karimi-nasab, S.M.T. Fatemi Ghomi, "Mult-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items", International Journal of Production Research, 2012 Feb
vol. 0,
no. 0,
pp.1-23,
2012.
149
K.kianfar, S.M.T. Fatemi Ghomi, A.oroojlooy Jadid., "Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GA", Engineering Applications of Artificial Intelligence, 2012 Feb
vol. 0,
no. 0,
,
2012.
150
M. Bank, S.M.T. Fatemi Ghomi, F..jolai, J. Behnamian, "Two-machine flow shop total tardiness scheduling problem with deteriorating jobs", Applied Mathematical Modelling, 2012 Feb
vol. 0,
no. 0,
,
2012.
151
M. Iranpoor, S.M.T. Fatemi Ghomi, M.zandieh, "Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity", International Journal of Production Research, 2012 Feb
vol. 0,
no. 0,
pp.1-14,
2012.
152
H. Mosadegh, M.zandieh, S.M.T. Fatemi Ghomi, "Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines", Applied Soft Computing, 2012 Feb
vol. 0,
no. 0,
,
2012.
153
H. Mosadegh, S.M.T. Fatemi Ghomi, M.zandieh, "Simultaneous solving of balancing and sequencing problems in mixed-model assembly line systems", International Journal of Production Research, 2012 Feb
vol. 0,
no. 0,
pp.1-23,
2012.
154
M. Bank, S.M.T. Fatemi Ghomi, F..jolai, J. Behnamian, "Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration", Advances In Engineering Software, 2012 Jan
vol. 47,
no. 0,
pp.1-6,
2012.
155
Hassan Javanshir, S.M.T. Fatemi Ghomi, Mrjan Fatemi Ghomi, "Investigating transportation system in container terminals and developing a yard crane scheduling model", Management Science Letters, 2012 Jan
vol. 2,
no. 0,
pp.171-180,
2012.
156
H. Moheb Alizadeh, S.M.T. Fatemi Ghomi, "Fuzzy development of Mean and Range control charts using statistical properties of different representative values", Journal of Intelligent and Fuzzy Systems, 2011 Dec
vol. 22,
no. 0,
pp.253-265,
2011.
157
J. Behnamian, S.M.T. Fatemi Ghomi, F..jolai, O. Amirtaheri, "Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm", Applied Soft Computing, 2011 Nov
vol. 0,
no. 0,
,
2011.
158
R. Sakiani, S.M.T. Fatemi Ghomi, M.zandieh, "Multi-objective supply planning for two-level assembly systems with stochastic lead times", Computers and Operations Research, 2011 Nov
vol. 0,
no. 0,
,
2011.
159
Siamak Baradaran, S.M.T. Fatemi Ghomi, M.ranjbar, S.s.hashemin, "Multi-mode renewable resource-constrained allocation in PERT networks", Applied Soft Computing, 2011 Oct
vol. 0,
no. 0,
,
2011.
160
M. Hekmatfar, S.M.T. Fatemi Ghomi, B. Karimi, "Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan", Applied Soft Computing, 2011 Sep
vol. 0,
no. 0,
,
2011.
161
B. Naderi, S.M.T. Fatemi Ghomi, M. Amin Nayeri, "A high performing metaheuristic for job shop scheduling with sequence-dependent setup times", Applied Soft Computing, 2011 Sep
vol. 10,
no. 0,
pp.703-710,
2011.
162
A. Kamali, S.M.T. Fatemi Ghomi, F..jolai, "A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain", Computers and Mathematics With Applications, 2011 Sep
vol. 62,
no. 0,
pp.3251-3269,
2011.
163
M.babaei, M.mohammadi, S.M.T. Fatemi Ghomi, "Lot sizing and scheduling in flow shop with sequence-dependent setups and backlogging", International Journal of Computer Applications, 2011 Sep
vol. 30,
no. 8,
pp.52-59,
2011.
164
H. Jananshir, M.s.fatemi Ghomi, S.M.T. Fatemi Ghomi, "Development of a model for yard crane scheduling in port container terminals", Quarterly Journal of Transportation Engineering, 2011 Aug
vol. 0,
no. 4,
pp.291-301,
2011.
165
J. Behnamian, S.M.T. Fatemi Ghomi, F.jolai, O. Amirtaheri, "Realistic two-stage flowshop batch scheduling problems with transportation capacity and times", Applied Mathematical Modelling, 2011 Aug
vol. 0,
no. 0,
,
2011.
166
N. Hamta, S.M.T. Fatemi Ghomi, U.bahalke, H.r.golpaigani, "Single machine scheduling problem with precedence constraints and deteriorating jobs", International Journal of Engineering, 2011 Jul
vol. 24,
no. 2,
pp.115-121,
2011.
167
A.boloori Arabani, M.zandieh, S.M.T. Fatemi Ghomi, "A cross-docking scheduling problem with sub-population multi-objective algorithms", International Journal of Advanced Manufacturing Technology, 2011 Jul
vol. 0,
no. 0,
,
2011.
168
M.mirabi, S.M.T. Fatemi Ghomi, F.jolai, "A two-stage hybrid flowshop scheduling problem in machine breakdown condition", Journal of Intelligent Manufacturing, 2011 Jul
vol. 0,
no. 0,
,
2011.
169
A.boloori Arabani, M.zandieh, S.M.T. Fatemi Ghomi, "Multi-objective genetic-based algorithms for a cross-docking scheduling problem", Applied Soft Computing, 2011 Jul
vol. 0,
no. 0,
,
2011.
170
N. Hamta, S.M.T. Fatemi Ghomi, F.jolai, Unes Bahalke, "Bi-criteria assembly line balancing by considering flexible operation times", Applied Mathematical Modelling, 2011 Jun
vol. 0,
no. 0,
,
2011.
171
S.M.T. Fatemi Ghomi, S.a.lesany, A.koochakzadeh, "Recognition of unnatural patterns in process control charts through combining two types of neural networks", Applied Soft Computing, 2011 Jun
vol. 0,
no. 0,
,
2011.
172
A. Najafi, A. Afrazeh, S.M.T. Fatemi Ghomi, "Development a hybrid method for measurement and prediction of knowledge worker productivity based on time series technique-Case study:Pars Khodro Company", , 2011 Mar
vol. 26,
no. 2,
pp.301-334,
2011.
173
J. Behnamian, S.M.T. Fatemi Ghomi, Mostafa Zandieh, "Development of a hybrid metaheuristic to minimize earliness and tardiness in a hybrid flowshop with sequence-dependent setup times", International Journal of Production Research, 2011 Mar
vol. 48,
no. 5,
pp.1415-1438,
2011.
174
M. Mohammadi, S.M.T. Fatemi Ghomi, "genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups", Expert Systems With Applications, 2011 Mar
vol. 0,
no. 0,
,
2011.
175
M. Narenji, S.M.T. Fatemi Ghomi, S.V.R. Nooraie, "Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost", International Journal of Systems Science, 2011 Mar
vol. 42,
no. 3,
pp.489-498,
2011.
176
S. Seyedalaghehband, S.M.T. Fatemi Ghomi, Mostafa Zandieh, "A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks", International Journal of Production Research, 2011 Feb
vol. 49,
no. 3,
pp.805-825,
2011.
177
A. Mirzazadeh Pirjal, S.M.T. Fatemi Ghomi, M. Seyed Esfahani, "A multiple items inventory model under uncertain external inflationary conditions", Trends In Applied Sciences Research, 2011 Feb
vol. 6,
no. 5,
pp.472-480,
2011.
178
M. Mohammadi, S.M.T. Fatemi Ghomi, "A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups", International Journal of Computer Integrated Manufacturing, 2011 Jan
vol. 24,
no. 1,
pp.87-93,
2011.
179
J. Behnamian, S.M.T. Fatemi Ghomi, "Hybrid flowshop scheduling with machine and resource-dependent processing times", Applied Mathematical Modelling, 2011 Jan
vol. 35,
no. 0,
pp.1107-1123,
2011.
180
E. Moradi, S.M.T. Fatemi Ghomi, M.zandieh, "Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem", Expert Systems With Applications, 2011 Jan
vol. 10,
no. 2,
pp.15-25,
2011.
181
A. Boloori Arabani, S.M.T. Fatemi Ghomi, "Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage", Expert Systems With Applications, 2011 Jan
vol. 38,
no. 0,
pp.1964-1979,
2011.
182
S.M.T. Fatemi Ghomi, A. Ardestani Jaafari, "Simulation optimization approach for facility layout problem-A queuing theory based approach", Journal of American Science, 2011 Jan
vol. 7,
no. 1,
pp.937-941,
2011.
183
M. Mohammadi, S.M.T. Fatemi Ghomi, "A new rolling-horizon technique for lotsizing in a capacitated pure flow shop with sequence-dependent setups", Scientia Iranica, 2010 Dec
vol. 17,
no. 2,
pp.85-94,
2010.
184
J. Behnamian, Mostafa Zandieh, S.M.T. Fatemi Ghomi, "Bi-objective oparallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique", Soft Computing, 2010 Dec
vol. 0,
no. 0,
,
2010.
185
Hadi Moheb Alizadeh, A. Arshadi Khamseh, S.M.T. Fatemi Ghomi, "Fuzzy development of multivariate variable control charts using the fuzzy likelihood ratio test", Scientia Iranica, 2010 Dec
vol. 17,
no. 2,
pp.150-163,
2010.
186
M. Mohammadi, Seyyed Ali Torabi, S.M.T. Fatemi Ghomi, B. Karimi, "A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups", International Journal of Advanced Manufacturing Technology, 2010 Oct
vol. 49,
no. 0,
pp.201-211,
2010.
187
S.M.T. Fatemi Ghomi, "An efficient architecture for scheduling flexible job-shop with machine availability constraints", International Journal of Advanced Manufacturing Technology, 2010 Sep
vol. 51,
no. 0,
,
2010.
188
J. Behnamian, Mostafa Zandieh, S.M.T. Fatemi Ghomi, "A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling", International Journal of Production Research, 2010 Sep
vol. 48,
no. 17,
pp.4949-4976,
2010.
189
A. Boloori Arabani, S.M.T. Fatemi Ghomi, Mostafa Zandieh, "A multi-criteria cross-docking scheduling with just-in-time approach", International Journal of Advanced Manufacturing Technology, 2010 Sep
vol. 49,
no. 0,
pp.741-756,
2010.
190
M. Mohammadi, S.M.T. Fatemi Ghomi, "Relax and Fix Heuristics for Simultaneous Lot Sizing and Sequencing the Permutation Flow Shops with Sequence-Dependent Setups", International Journal of Industrial Engineering and Production Research, 2010 Sep
vol. 21,
no. 3,
pp.147-153,
2010.
191
B. Naderi, S.M.T. Fatemi Ghomi, M. Amin Nayeri, "Scheduling open shops with parallel machines to minimize total completion time", Journal of Computational and Applied Mathematics, 2010 Sep
vol. 0,
no. 0,
,
2010.
192
B. Naderi, S.M.T. Fatemi Ghomi, M. Amin Nayeri, "Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time", International Journal of Advanced Manufacturing Technology, 2010 Sep
vol. 0,
no. 0,
,
2010.
193
B. Naderi, S.M.T. Fatemi Ghomi, M. Amin Nayeri, "A study on open shop scheduling to minimize total tardiness", International Journal of Production Research, 2010 Sep
vol. 0,
no. 0,
,
2010.
194
J. Behnamian, Mostafa Zandieh, S.M.T. Fatemi Ghomi, "Due windows group scheduling using an effective hybrid optimization approach", International Journal of Advanced Manufacturing Technology, 2010 Aug
vol. 46,
no. 0,
pp.721-735,
2010.
195
J. Behnamian, S.M.T. Fatemi Ghomi, Mostafa Zandieh, "Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system,simulated annealing and variable neighbourhood search", Expert Systems, 2010 Aug
vol. 0,
no. 0,
,
2010.
196
R. Sakiani, , S.M.T. Fatemi Ghomi, "Corrigendunom to:Genetic algorithm gfor supply planning in two-level assembly systems with random lead times[Engineering Applications of Artificial Intelligence 22(2009)906-915]", Engineering Applications of Artificial Intelligence, 2010 Aug
vol. 0,
no. 0,
,
2010.
197
S. Baradaran, S.M.T. Fatemi Ghomi, "A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks", Advances In Engineering Software, 2010 Jul
vol. 41,
no. 0,
,
2010.
198
J.rezaei, S.M.T. Fatemi Ghomi, M. Davoodi Monfared, Fatemeh Rezaei, "A EOQ model for deteriorating items with genetic algorithm approach", Sharif Journal of Science and Technology, 2010 Jun
vol. 0,
no. 1,
pp.83-90,
2010.
199
M. Mirabi, S.M.T. Fatemi Ghomi, "A hybrid electromagnetism-like algorithm for supplier selection in make-to-order planning", .Scientia Iranica, 2010 Jun
vol. 17,
no. 0,
,
2010.
200
M. Mirabi, S.M.T. Fatemi Ghomi, "Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem", Robotics and Computer-Integrated Manufacturing, 2010 Jun
vol. 26,
no. 0,
pp.564-569,
2010.
201
M. Mokhlesian, S.M.T. Fatemi Ghomi, F.jolai, "Economic lot scheduling problem with consideration of money time value", International Journal of Industrial Engineering Computations, 2010 Jun
vol. 1,
no. 0,
pp.121-138,
2010.
202
S.M.T. Fatemi Ghomi, M. Iranpoor, "Earliness-tardiness-lost sales dynamic job-shop scheduling", Production Engineering Research & Development, 2010 May
vol. 4,
no. 0,
,
2010.
203
M. Mohammadi, S.M.T. Fatemi Ghomi, B. Karimi, Seyyed Ali Torabi, "MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups", International Journal of Production Research, 2010 May
vol. 48,
no. 15,
pp.2957-2973,
2010.
204
J. Gheidar Kheljani, S. Ghodsypour, S.M.T. Fatemi Ghomi, "Supply chain optimization policy for a supplier selection problem:a mathematical programming approach", Iranian Journal of Operations Research, 2010 Apr
vol. 2,
no. 1,
,
2010.
205
M. Kalantari, S.M.T. Fatemi Ghomi, "Comparison of estimators of standard deviation,mean moving range and median moving range to estimate process standard deviation using autocorrelated data", , 2010 Apr
vol. 44,
no. 1,
pp.89-95,
2010.
206
H. Khademi Zare, S.M.T. Fatemi Ghomi, B. Karimi, M. Jenabi, A. Raad, "Development of a solution approach based on Lagrangian relaxation and genetic algorithm for multi-product multi-stage multi-period lot size determination problem with constrained resources", , 2010 Apr
vol. 44,
no. 1,
pp.25-37,
2010.
207
M. Mohammadi, S.M.T. Fatemi Ghomi, B. Karimi, Seyyed Ali Torabi, "Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups", Journal of Intelligent Manufacturing, 2010 Apr
vol. 21,
no. 0,
pp.501-510,
2010.
208
J. Behnamian, S.M.T. Fatemi Ghomi, "Development of a PSO-SA hybrid metaheuristic for a new comprehensive regression model to time-series forecasting", Expert Systems With Applications, 2010 Mar
vol. ,
no. 37,
,
2010.
209
F. Ahmadyzar, , S.M.T. Fatemi Ghomi, "Group shops scheduling with makespan criterion subject to random release dates and processing times", , 2010 Jan
vol. ,
no. 37,
,
2010.
210
B. Naderi, S.M.T. Fatemi Ghomi, M. Amin Nayeri, M. Zandieh, "A contribution and new heuristics for open shop scheduling", , 2010 Jan
vol. ,
no. 37,
,
2010.
211
B. Naderi, M. Zandieh, S.M.T. Fatemi Ghomi, "A Study on Integrating Sequence Dependet Setup Time Flexible Flow Lines and Preventive Maintenance Scheduling", Journal of Intelligent Manufacturing, 2009 Dec
vol. ,
no. 20,
,
2009.
212
S.M.T. Fatemi Ghomi, B. Karimi, "new dispatching rules to minimize rejection and trdiness costs in a dynamic flexble flow shop", , 2009 Dec
vol. ,
no. 8,
,
2009.
213
Mir Bahadorgholi Arynezhad, Mehdi Karimi-nasab, S.M.T. Fatemi Ghomi, "Building a multi-objective model for multi-product multi-period production planning with controllable processing times: A real case problem", Journal of Industrial Engineering, 2009 Dec
vol. 4,
no. 0,
pp.1-11,
2009.
214
B. Naderi, M. Zandieh, S.M.T. Fatemi Ghomi, "Scheduling job Shop Problems With Sequence -Dependent Setup Times", International Journal of Production Research, 2009 Nov
vol. ,
no. 21,
,
2009.
215
J. Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi, "Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms", , 2009 Oct
vol. ,
no. ,
,
2009.
216
J. Behnamian, S.M.T. Fatemi Ghomi, M. Zandieh, "A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic", Expert Systems With Applications, 2009 Oct
vol. ,
no. 36,
,
2009.
217
J. Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi, "Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm", Expert Systems With Applications, 2009 Aug
vol. ,
no. 36,
,
2009.
218
B. Naderi, M. Zandieh, S.M.T. Fatemi Ghomi, "Scheduling sequence-dependent setup time job shops with preventive maintenance", , 2009 Jul
vol. ,
no. 43,
,
2009.
219
A. Hosseinzadeh Kashan, B. Karimi, S.M.T. Fatemi Ghomi, "A note on minimizing makespan on a single batch processing machine with nonidentical job sizes", , 2009 Jun
vol. ,
no. 410,
,
2009.
220
S. Baradaran, S.M.T. Fatemi Ghomi, "A hybrid heuristic rule for constrained resource allocation in PERT type networks", World Applied Sciences Journal, 2009 Jun
vol. 7,
no. 10,
pp.1324-1330,
2009.
221
F. Ahmadyzar, , S.M.T. Fatemi Ghomi, "Application of Chance-Constrained Programming for Stochastic Group Shop Scheduling Problem", , 2009 May
vol. ,
no. 42,
,
2009.
222
S.M.T. Fatemi Ghomi, N. Azad, "Designing A Supply Chain Model With Consideration Demand Forecasting and Information Sharing", South African Journal of Industrial Engineering, 2009 May
vol. ,
no. 20,
,
2009.
223
A. Mirzazadeh Pirjal, M. Seyed Esfahani, S.M.T. Fatemi Ghomi, "An Inventory Model Under Uncertain Inflationary Conditions, Finite Production Rate and Inflation-Dependent Demand Rate for Deteriorating Items With Shortages", International Journal of Systems Science, 2009 Jan
vol. ,
no. 1,
,
2009.
224
M. Mohammadi, S.M.T. Fatemi Ghomi, B. Karimi, S.A. Torabi, "Devepment of Heuristics for Multi -Product Multi -Level Capacitated Lotsizing Problem With Sequence-Dependent Setups", Journal of Applied Sciences, 2009 Jan
vol. ,
no. 9,
,
2009.
225
M. Jenabi, S.M.T. Fatemi Ghomi, S.A. Torabi, "Finite Horizon Economic Lot and Delivery Scheduling Problem:Flexible Flow Lines With Unrelated Parallel Machines and Sequence Dependent Setups", , 2008 Jun
vol. ,
no. 2,
,
2008.
226
M. Mirabi, S.M.T. Fatemi Ghomi, F. Joulai Ghazvini, M. Zandieh, "Hybrid Electromagnetism -Like Algorithm for the Flowshop Scheduling with Sequence -Detup Times", Journal of Applied Sciences, 2008 May
vol. ,
no. 8,
,
2008.
227
S. Baradaran, S.M.T. Fatemi Ghomi, M. Rabbani, S. Hashemin, "Development of a Constructive Heuristics Rule for Constrained Resource Allocation in Stochastic Networks", Journal of Applied Sciences, 2008 May
vol. ,
no. 8,
,
2008.
228
A. Arshadi Khamseh, S.M.T. Fatemi Ghomi, M. Amin Nayeri, "Economical Design of Double Variables Acceptance Sampling With Inspection Errors", , 2008 Feb
vol. ,
no. 7,
,
2008.
229
A. Azaron, S.M.T. Fatemi Ghomi, "Lower Bound for The Mean Project Completion Time in Dynamic PERT Networks", European Journal of Operational Research, 2008 Jan
vol. ,
no. 186,
,
2008.
230
D. Rezai, H.R. Sheibi, A. Refahi, S.M.T. Fatemi Ghomi, "Comparison of Factorial and Taguchis Methods in Optimization of Effective Parameters of Coal Flotation", Asian Journal of Chemistry, 2008 Jan
vol. ,
no. 1,
,
2008.
231
H. Zolfi, S.M.T. Fatemi Ghomi, B. Karimi, "Supply Chain Operations Planning with Setup Times and Multi Period Capacity Consumption", , 2007 Dec
vol. ,
no. 246,
,
2007.
232
Jaefar Rezaei, S.M.T. Fatemi Ghomi, "An inventory (Q, r) model with stochastic demand and fuzzy costs", , 2007 Oct
vol. 0,
no. 23,
pp.105-120,
2007.
233
S.M.T. Fatemi Ghomi, "A Methodology to Analyze The Transient Behavior of Exponential Queuing Systems", , 2007 May
vol. 0,
no. 0,
,
2007.
234
M.R. Gholamian, S.M.T. Fatemi Ghomi, "Farsjum ,A Fuzzy System For Ranking Sparse Judgment Matrices: A Case Study in Soccer Tournaments", International Journal of Uncertainty Fuzziness and Knowledge-Based Systems, 2007 Mar
vol. ,
no. 1,
,
2007.
235
M.R. Gholamian, S.M.T. Fatemi Ghomi, "Meta Knowledge of Intelligent Manufacturing:An Overview o`f State-of -The Art", Applied Soft Computing, 2007 Jan
vol. ,
no. 7,
,
2007.
236
M.R. Gholamian, S.M.T. Fatemi Ghomi, "A Hybrid System for Multiobjective Problems-A Case Study in NP-Hard Problems", Knowledge-Based Systems, 2007 Jan
vol. ,
no. 20,
,
2007.
237
S.M.T. Fatemi Ghomi, "Expected Duration of Dynamic Markov Pert Networks", , 2007 Jan
vol. ,
no. 18,
,
2007.
238
A. Mohammadi Nia, S.M.T. Fatemi Ghomi, "Earliness Tardiness Production Planning and Scheduling in Flexible Flowshop Systems Under Finite Planning Horizon", Applied Mathematics and Computation, 2007 Jan
vol. ,
no. 184,
,
2007.
239
M. Jenabi, S.M.T. Fatemi Ghomi, S.A. Torabi, B. Karimi, "Two Hybrid Meta -Heuristics for The Finite Horizon ELSP in Flexible Flow Lines With Unrelated Parallel Machines", Applied Mathematics and Computation, 2007 Jan
vol. ,
no. 186,
,
2007.
240
S.M.T. Fatemi Ghomi, F. Joulai Ghazvini, N. Seydforushlahiji, "A New Heuristic For Resource -Constrained Project Scheduling in Stochastic Networks Using Critical Chain Concept", European Journal of Operational Research, 2007 Jan
vol. ,
no. 176,
,
2007.
241
H. Khademi Zare, S.M.T. Fatemi Ghomi, B. Karimi, "Developing a Heuristic Algorithm for Order Production Planning Using Network Models Under Uncertainty Conditions", Applied Mathematics and Computation, 2006 Nov
vol. ,
no. 182,
,
2006.
242
M.R. Gholamian, S.M.T. Fatemi Ghomi, "A hybrid intelligent system for multiobjective decision making problems", Computers and Industrial Engineering, 2006 Nov
vol. ,
no. 51,
,
2006.
243
M. Zandieh, S.M.T. Fatemi Ghomi, S. Moattar Husseini, "An Immune Algorithm Approach to Hybrid Flow Shops Scheduling With Sequence -Dependent Setup Times", Applied Mathematics and Computation, 2006 Sep
vol. ,
no. 180,
,
2006.
244
S. Hashemin, S.M.T. Fatemi Ghomi, "Optimal Constrained Resource Allocation in PERT : A Hybrid Approach", , 2006 Aug
vol. ,
no. 1,
,
2006.
245
H. Khademi Zare, S.M.T. Fatemi Ghomi, "Developing an Algorithm for Limited Resources Allocation and Leveling in Multi-Stage, Multi-Product and Multi-Period Production Planning", , 2006 Jul
vol. 0,
no. 0,
,
2006.
246
S.A. Torabi, S.M.T. Fatemi Ghomi, B. Karimi, "A Hybrid Genetic Algorithm for Finite Horizon Economic Lot and Delivery Scheduling in Supply Chains", European Journal of Operational Research, 2006 Jul
vol. ,
no. 173,
,
2006.
247
M. Hakimi Asiabar, S.M.T. Fatemi Ghomi, "Analysis of Ordered Categorical Data Using Expected Loss Minimization", Quality Engineering, 2006 Jun
vol. ,
no. 18,
,
2006.
248
S.s.hashemin, S.M.T. Fatemi Ghomi, "Splittable stochastic project scheduling with constrained renewable resource", Journal of Industrial Engineering International, 2006 Mar
vol. 2,
no. 1,
pp.19-30,
2006.
249
B. Karimi, S.M.T. Fatemi Ghomi, J.m Wilson, "A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over", Journal of The Operational Research Society, 2006 Feb
vol. ,
no. 57,
,
2006.
250
M.R. Gholamian, S.M.T. Fatemi Ghomi, "An Empirical Research in Intelligent Manufacturing : A Frame based Representaion of AI Usages in Manufacturing Aspects", , 2006 Feb
vol. ,
no. 159,
,
2006.
251
M.R. Gholamian, S.M.T. Fatemi Ghomi, "A Hybrid Computational Intelligent System for Multiobjective Supplier Selection Problem", , 2006 Feb
vol. ,
no. 2,
,
2006.
252
A. Azaron, S.M.T. Fatemi Ghomi, "Multi-Objective Lead Time Control in Multistage Assembly Systems", , 2005 Dec
vol. ,
no. 4,
,
2005.
253
S.s.hashemin, S.M.T. Fatemi Ghomi, "A hybrid method to find cumulative distribution function of completion time of GERT network", Journal of Industrial Engineering International, 2005 Oct
vol. 1,
no. 1,
pp.1-9,
2005.
254
M. Zandieh, S.M.T. Fatemi Ghomi, S. Moattar Husseini, "General models for hybrid flow shop sequencing problems with sequence dependent setup times", , 2005 Oct
vol. ,
no. 4,
,
2005.
255
S.A. Torabi, S.M.T. Fatemi Ghomi, B. Karimi, "The finite horizon economic lot scheduling in flexible flow lines", , 2005 Aug
vol. ,
no. 3,
,
2005.
256
S.A. Torabi, B. Karimi, S.M.T. Fatemi Ghomi, "The common cycle economic lot scheduling in flexible job shops: The finite horizon case", International Journal of Production Economics, 2005 Jul
vol. ,
no. 1,
,
2005.
257
S.A. Torabi, S.M.T. Fatemi Ghomi, B. Karimi, "Economic Lot Scheduling in Flexible Job Shops", , 2005 Jul
vol. ,
no. 2,
,
2005.
258
M.R. Gholamian, S.M.T. Fatemi Ghomi, "A hybrid systematic design for multiobjective market problems : a case study in crude oil markets", Engineering Applications of Artificial Intelligence, 2005 Jun
vol. ,
no. 18,
,
2005.
259
S.A. Torabi, S.M.T. Fatemi Ghomi, B. Karimi, "The Economic Lot and Delivery Scheduling Problem in Flexible Job Shops", , 2005 May
vol. 0,
no. 0,
,
2005.
260
Jaefar Rezaei, S.M.T. Fatemi Ghomi, "Computation of reorder point in the fuzzy condition", Journal of Industrial Management Studies, 2005 Feb
vol. 0,
no. 7,
pp.1-13,
2005.
261
S.M.T. Fatemi Ghomi, F. Joulai Ghazvini, M. Mohammadi, "A two-echelon repairable inventory system with two kinds of defectives,both repaired at the central depot", , 2004 Oct
vol. ,
no. 2,
,
2004.
262
B. Karimi, S.M.T. Fatemi Ghomi, J.m Wilson, "Classification of Single Level lot sizing Models", , 2003 Jun
vol. ,
no. 3,
,
2003.
263
B. Karimi, S.M.T. Fatemi Ghomi, J.m Wilson, "The capacitated lot sizing problem : A review of models and algorithms", , 2003 May
vol. ,
no. 31,
,
2003.
264
S.M.T. Fatemi Ghomi, "Optimal control of service rates and arrivals in Jackson networks", European Journal of Operational Research, 2003 Apr
vol. ,
no. ,
,
2003.
265
S.M.T. Fatemi Ghomi, F. Joulai Ghazvini, M. Mohammadi, "A two- echelon repairable inventory system with two kinds of defectives ,one kind repaired at the centeral depot and the other one repaired at stocking centers", , 2003 Mar
vol. 0,
no. 54,
,
2003.
266
S.M.T. Fatemi Ghomi, "A new structural mechanism for reducibility of stochastic PERT networks", European Journal of Operational Research, 2003 Feb
vol. ,
no. ,
,
2003.
267
B. Karimi, S.M.T. Fatemi Ghomi, "A new heuristic for the CLSP problem with backlogging and set-up carryover", , 2002 Dec
vol. ,
no. 5,
,
2002.
268
B. Karimi, S.M.T. Fatemi Ghomi, "New Heuristic Methods for Single-Level, multi-product Capacitated Dynamic Lot Sizing with Setup Carry overs", , 2002 Nov
vol. ,
no. 3,
,
2002.
269
S.M.T. Fatemi Ghomi, E. Temoore, "Path critical index and activity critical index in PERT networks", European Journal of Operational Research, 2002 Aug
vol. ,
no. 141,
,
2002.
270
S.M.T. Fatemi Ghomi, B. Ashjari, "A simulation model for multi-project resource allocation", International Journal of Project Management, 2002 Feb
vol. ,
no. 20,
,
2002.
271
S.M.T. Fatemi Ghomi, "A new approach to approximate completion time distribution function of stochastic PERT networks", , 2002 Feb
vol. ,
no. ,
,
2002.
272
S.M.T. Fatemi Ghomi, E. Temoore, "An improved method for Dodin`s approach to approximate the distribution functions in stochastic network", , 2002 Jan
vol. ,
no. ,
,
2002.
273
S.M.T. Fatemi Ghomi, S.A. Torabi, "Extension of common cycle lot-size scheduling for multi-stage arborescent flow-shop environment", , 2002 Jan
vol. ,
no. 26,
,
2002.
274
S.M.T. Fatemi Ghomi, "Approximating completion time distribution function for stochastic PERT networks", , 2002 Jan
vol. ,
no. ,
,
2002.
275
S.M.T. Fatemi Ghomi, S. Hashemin, "An analytical method for single level-constrained resources problem with constant set-up cost", , 2002 Jan
vol. ,
no. 26,
,
2002.
276
S.M.T. Fatemi Ghomi, B. Ashjari, "A heuristic method for resource constrained allocation in multi-project scheduling", , 2002 Jan
vol. ,
no. ,
,
2002.
277
S.M.T. Fatemi Ghomi, S. Hashemin, "A new analytical algorithm and generation of gaussian quadrature formual for stochastic network", European Journal of Operational Research, 1999 May
vol. ,
no. 3,
,
1999.
278
S.M.T. Fatemi Ghomi, F. Joulai Ghazvini, "Combination of approximation and simulation approaches for distribution functions in stochastic networks", , 1999 Mar
vol. ,
no. 3,
,
1999.
279
S.M.T. Fatemi Ghomi, F. Joulai Ghazvini, "A parirwise interchange algorithm for parallel machine scheduling", Production Planning and Control, 1998 Jul
vol. ,
no. 7,
,
1998.
280
S.M.T. Fatemi Ghomi, "Computation of probability density function and cumulative distribution function of project completion time", , 1989 May
vol. 0,
no. 11,
pp.154-157,
1989.