1
Zeinab Jahanbani, Majid Ataee Pour, Ali Mortazavi, "PRIORITIZING THE UNDERGROUND MINING METHODS USING FUZZY TOPSIS METHOD ", 9th Iranian Rock Mechanics Conference (IRMC9), May 2024
2
Zeinab Jahanbani, Majid Ataee Pour, Ali Mortazavi, "Using the Fdanp Method to Rank the Mining and Operational Factors in Underground Mining Method Selection ", 2024 SME Annual Conference & EXPO, February 2024
3
Ali Zamani, Majid Ataee Pour,, "Application of metaheuristic algorithms in long-term production planning of open pit mines ", 12th Iranian Mining Engineering Conference, February 2024
4
Mohammad Hosein Salimi, Majid Ataee Pour, Vahid Nikbin, "Implementation of integer programming algorithm to optimize stope boundary of a gold vein deposit ", 12th Iranian mining engineering conference, February 2024
5
Abbas َAmou, Majid Ataee Pour,, "The effect of combining chainsaw machine and diamond wire cutting on the production rate in dimensional stone mines ", 12th Iranian Mining Engineering Conference, February 2024
6
Maryam Sadeghbeygi Olyayi, Majid Ataee Pour, Asieh Hekmat, "Challenges and opportunities of mining companies in 2023 with emphasis on environmental, social and governance issues ", The third national conference on mining and green mining industries of Iran, October 2023
7
Mahammad Hossein Fattahi, Majid Ataee Pour, "The approach of in pit dumping is a solution to deal with the destructive effects of open pit mines ", The 3rd Iranian Conference of Green Mining & Mine Industries, October 2023
8
Amir Fazli Allah Abadi, Majid Ataee Pour, "Investigating sustainable mine production using game theory ", 11th Iranian Mining Engineering Conference & 7th International Mine & Mining Industries Congress, May 2023
9
Ali Salehi, Hossen Zarbi Holag, Majid Ataee Pour, "Development of the branch and bound technique for determining the optimum stope layout ", 11th Iranian Mining Engineering Conference & 7th International Mine & Mining Industries Congress, May 2023
10
Zakaria Jalali, Majid Ataee Pour, Hesam Dehghani, "A review on mining projects evaluation under uncertainty using real option technique ", 11th Iranian Mining Engineering Conference & 7th International Mine & Mining Industries Congress, May 2023
11
Zeinab Jahanbani, Majid Ataee Pour, Ali Mortazavi, "Study the interaction of influential criteria on the assessment of sustainable development in mining ", 11th Iranian Mining Engineering Conference & 7th International Mine & Mining Industries Congress, May 2023
12
Zeinab Jahanbani, Majid Ataee Pour, Ali Mortazavi, "Risk Assessment of Stope Collapse in Underground mines by using Bow-tie Diagram Technique ", 11th Iranian Mining Engineering Conference & 7th International Mine & Mining Industries Congress, May 2023
13
Nikbin, Majid Ataee Pour, "A new MIP model to optimize stope boundaries in vein type deposits ", 2nd International Conference in optimization of production and service systems, November 2022
14
Zeinab Jahanbani, Majid Ataee Pour, Ali Mortazavi, "Review of economic parameters in underground mining method selection using Z-numbers Theory ", The 3rd Iranian Mining Technologies Conference, March 2022
15
Amir Fazli Allah Abadi, Majid Ataee Pour, "Application of game theory in safety issues of coal mines ", The third Iranian Mining Technologies, March 2022
16
Morteza Shenavar, Majid Ataee Pour, Mehdi Rahmanpour, "Long termproduction scheduling optimisation in an underground pb/zn mine ", 27th International Mining Congress and Exhibition of Turkey, March 2022
17
Zeinab Jahanbani, Majid Ataee Pour, Ali Mortazavi, "A STUDY OF EFFECTIVE PARAMETERS IN UNDERGROUND MINING METHOD SELECTION USING Z-NUMBERS THEORY ", 27th International Mining Congress and Exhibition of Turkey, March 2022
18
Shookoufeh Rahimi, Majid Ataee Pour, S.Hassan Madani, "Modeling the distribution of methane gas in underground coal mines under different gas emissions ", 5th National Iranian Coal Congress., September 2021
19
Vahid Amini, Majid Ataee Pour, Hasan Ghasemzadeh, "Investigation of the problem of the Riddle algorithm in determining the optimal range maximization and accurate placement of the pillars. ", 1st International Conference & 4th National Conference on Materials, Metallurgy & Mining, February 2021
20
Sajjad Rostamian, Majid Ataee Pour, "Feasibility study of application of keshtel algorithm in mine production scheduling ", 9th Iranian Mining Engineering Conference 6th International Mine & Mining Industries Congress, February 2021
21
Sajjad Rostamian, Seyed Yasin Razavi, Majid Ataee Pour, "Sungun Copper Mine Optimum pit limit determination using Keshtel algorithm ", 9th Iranian Mining Engineering Conference 6th International Mine & Mining Industries Congress, February 2021
22
Zohre Rezaei, Majid Ataee Pour, Mohammadreza Izadbakhsh, "Calculation of Stable Pillar Dimensions in Room and Pillar or Stope and Pillar Mining Method Using Numerical Analysis ", 9th Iranian Mining Engineering Conference 6th International Mine & Mining Industries Congress, February 2021
23
Shookoufeh Rahimi, Majid Ataee Pour, S.Hassan Madani, "Geostatistical Modeling of in-situ Gas Content and Associated Uncertainty Using Sequential Gaussian Simulation ", 9th Iranian Mining Engineering Conference and 6th International Mine & Mining Industries Congress, February 2021
24
Seyyed Hassan Seyyedesmaeili, Majid Ataee Pour, "Comparison of Imperialist Competitive Algorithm, genetic and Tabu search for optimization
of truck-shovel dispatching system in open pit mines ", 9th Iranian Mining Engineering Conference and 6th International Mine & Mining Industries Congress, February 2021
25
Hasan Ghasemzadeh, Majid Ataee Pour, Vahid Amini, "Stope limits Optimization for two Iron ore deposits Using Floating Stope and Maximum Value Neighborhood Algorithms ", 2nd National Conference of Modelling in Mining Engineering and Related Sciences, November 2020
26
Sajjad Rostamian, Majid Ataee Pour, Mostafa Hajiaghaei-Keshteli, "Feasibility study of the application of keshtel algorithm in determining the ultimate pit limit ", 2nd National Conference of Modelling in Mining Engineering and Related Sciences, November 2020
27
Seyyed Hassan Seyyedesmaeili, Majid Ataee Pour, "Optimization of truck-shovel dispatching system in open pit mines using Imperialist Competitive Algorithm ", 2nd National Conference of Modelling in Mining Engineering and related sciences, November 2020
28
Morteza Shenavar, Majid Ataee Pour, Mehdi Rahmanpour, "An overview of production planning models in underground mines ", Iranian Mining Engineering Conference, February 2020
29
Shookoufeh Rahimi, Majid Ataee Pour, S.Hassan Madani, "Prediction of methane emissions in coal mines ", Iranian mining engineering conference, February 2020
30
Morteza Shenavar, Majid Ataee Pour, Mehdi Rahmanpour, "Production Scheduling Optimization in Sublevel Caving Method with the Objective of NPV Maximization ", Iranian Mining Engineering Conference, February 2020
31
Shookoufeh Rahimi, Majid Ataee Pour, "Environmental impact assessment and sustainable development of Angoran mine in Iran ", The 2nd Iranian conference of green mining & mine industry, December 2019
32
Somaye Narrei, Majid Ataee Pour, "Evaluation of choice experiment technique in estimation of willingness to pay of individuals about sustainablr mining ", 38th national geoscience congress, April 2019
33
Asghar Amanpour, Abolfazl Amanpour, Majid Ataee Pour, "Educational indicators of sustainable development in mining industry ", The 1st Iranian conference of Green Mining and Mine Industries, December 2018
34
Saeid Javadzadeh, Majid Ataee Pour, "Determination of ultimate pit limits using Imperialist Competitive Algorithm ", The 1st Iranian conference of Green Mining and Mine Industries, December 2018
35
Shookoufeh Rahimi, Majid Ataee Pour, "Mine Closure Risk Model with Promethee Technique ", 5th international mine and mining industries congress&7th Iranian mining engreening conference, November 2018
36
Saeid Javadzadeh, Majid Ataee Pour, Vahid Hosseinpour, "Modeling optimum mining limits with Imperialist Competitive Algorithm ", 27th International Symposium on Mine Planning & Equipment Selection-MPES 2018, November 2018
37
Morteza Shenavar, Majid Ataee Pour, Mehdi Rahmanpour, "Production Scheduling in Sublevel Caving Method with the Objective of NPV Maximization ", 27th International Symposium on Mine Planning and Equipment Selection - MPES 2018, November 2018
38
Majid Ataee Pour, Somaye Narrei, "Application of choice experiment technique in sustainable mining employment ", Seventh Iranian Mining Engineering Conference, November 2018
39
Zeinab Jahanbani, Majid Ataee Pour, "Review of the Ultimate Limit Optimization of Underground Mining in the Riddles Algorithm ", 7th Iranian Mining Engineering Conference and 5th International Mine and Mining Industries Congress, November 2018
40
Majid Ataee Pour, Somaye Narrei, "Simulation of cut off grade with regard to metal price uncertainty ", Seventh Iranian Mining Engineering Conference, November 2018
41
Ebrahim Noroozighalaini, Majid Ataee Pour, "Developing the mine planing using bee algorithm ", 1st national conference of modelling in mining engineering, April 2018
42
Shahin Farzadpur, Majid Ataee Pour, "Optimisation of mining sector share in the country GDP using regression technique ", 1st national conference of modelling in mining engineering, April 2018
43
Vahid Nikbin, Majid Ataee Pour, Kourosh Shahriar, "A New Mixed Integer Programming Model for Stope Boundary Optimization ", 1st National Conference of Modelling in Mining Engineering, April 2018
44
Saeid Javadzadeh, Majid Ataee Pour, "modeling optimum Mining limits with Imperialist Competitive Algorithm ", 1st National Conferanse of Modelling in Mininig Engineering, April 2018
45
Ebrahim Noroozighalaini, Majid Ataee Pour, "comparison of bee and genetic algorithm efficiency in determination of mine ultimate pit limit ", 1st national conference of modelling in mining engineering, April 2018
46
Vahid Nikbin, Majid Ataee Pour, Kourosh Shahriar, Yashar Pourrahimian, "A greedy algorithm for stope boundaries optimization ", Mining Optimization Laboratory (MOL) – Report Eight, September 2017
47
Ali Mahmoodi Moghanlu, Majid Ataee Pour, "Optimal limit analysis of underground mine using floating stope algorithm ", Application of Computers and Operations Research in the Mining Industry (APCOM), August 2017
48
Ali Mahmoodi Moghanlu, Majid Ataee Pour, "The Necessity of Futures Studies Approach Implementation in Mine Planning ", 38th International Symposium of Application of Computers and Operations Research in the Mining Industry (APCOM),, August 2017
49
Ali Mahmoodi Moghanlu, Majid Ataee Pour, Ali Nasirineghad, "The effects of time on long term planning of open pit mines ", 4rd National Iranian Open Pit Mining Conferences, May 2017
50
Ebrahim Noroozighalaini, Majid Ataee Pour, "Determine the ultimate pit limit using artificial bee colony algorithm ", 4th National open pit mining conferance, May 2017
51
Mojtaba Fazelinia, Mojtaba Zaheri, Majid Ataee Pour, "Pit limit optimisation considering sustainable development ", Fourth International Mine and Mining Industries Congress and Sixth Iranian Mining Engineering Conference, November 2016
52
, Majid Ataee Pour, "Modelling (Growth technique) ", Fourth International Mine and Mining Industries Congress and Sixth Iranian Mining Engineering Conference, November 2016
53
Ali Mahmoodi Moghanlu, Majid Ataee Pour, "Necessity of using futures studies in mine planning ", ,Fourth International Mine and Mining Industries Congress and Sixth Iranian Mining Engineering Conference, November 2016
54
Vahid Nikbin, Majid Ataee Pour, Kourosh Shahriar, "A New Dynamic Programming Algorithm Based on Graph for Optimization of Stope Boundaries ", 4th International Mine & Mining Industries Congress & Expo & 6th Iranian Mining Engineering Conference, November 2016
55
Zohre Rezaei, Majid Ataee Pour, S.Hassan Madani, "Numerical Simulation of Airflow in Mine Transport Tunnel: Solid-Fluid Interaction Approach ", 4th international mine and mining industries & 6th Iranian mining engineering conference, November 2016
56
Morteza Shenavar, Majid Ataee Pour, Mehdi Rahmanpour, "Evaluating Mineable reserve in Presence of Grade Unceertaimty Using Floating Stope Optimizer in Underground Mines ", 6th International Conference on Computer Applications in the Minerals Industries, October 2016
57
Siroos Andisheh, Majid Ataee Pour, "Selecting the best financing method using AHP ", 2nd Iranian Mining Technologies Conference and Exhibition, September 2016
58
Zohre Rezaei, Majid Ataee Pour, S.Hassan Madani, "Sensitivity Analysis of Variations of Drop Pressure Due to Barriers and Flow in Mine Ventilation Networks ", 2th Iranian Mining Technologies Conference and Exhibition, September 2016
59
Morteza Sheybanisefat, Majid Ataee Pour, "Determination of the block economic value under price uncertainty ", 2nd Iranian Mining Technologies Conference and Exhibition, September 2016
60
Hamid Ghahremani, Majid Ataee Pour, "Identifying potential zones for lead-zinc mineralization in GIS using fuzzy inkgration on 1: 100,000 Hashjin sheet ", 2nd Iranian mining technologies Conference and Exibition, September 2016
61
Manouchehr Heidarpanah, Hossein Hassani, Majid Ataee Pour, "Investigation of Gold Potencial using Integration of Various Data layers in GIS environmental in 1:100000 Geological map of Takab, Iran ", 2nd National Conference of Geology and Exploration of Resources, June 2016
62
Vahid Nikbin, Majid Ataee Pour, Kourosh Shahriar, "A New Dynamic Programming Algorithm for Optimization of Underground Mining Limits ", The 9th International Conference of Iranian Operations Research Society, April 2016
63
Morteza Sheybanisefat, Majid Ataee Pour, "Evaluation of mining projects using the combined model binomial tree-Monte Carlo ", The 9th International Conference of Iranian Operations Research Society, April 2016
64
Zohre Rezaei, Majid Ataee Pour, S.Hassan Madani, "Sensitivity Analysis of Variation of Drop Pressure due to Barriers and Flow in Mine Ventilation Networks ", The 9th International Conference of Iranian Operations Research Society, April 2016
65
ٍE.Moosavi, Gholamnejad, Majid Ataee Pour, Esmaile Khorram, "Production scheduling using Augmented Lagrangian and genetic Algorithm Optimization ", 24thInternational mining Congress and Exhibition of Turkey-IMCET 15 Antalya APril 14-17n .2015, April 2016
66
Seyyedhossein Hashemi, Abdolrahim Javaherian, Majid Ataee Pour, H. Khoshdel, "Facies simulation of Chanel bodies using multiple point geostatistics and probability perturbation - A case study ", Petroleum Geostatistics 2015, September 2015
67
Hamid Ghahremani, Majid Ataee Pour, "The potential polimetal mineralization issue 1: 100,000 Hashjin using ASTER data ", 7th symposium of iranian society of economic Geology, August 2015
68
Hamid Ghahremani, Majid Ataee Pour, "potential copper-gold sheet 1: 100,000 Hashjin using fuzzy logic in GIS ", the First International Conference on the Application of Modern Sciences in Irans Geographic Rresearch (AMSIGR 2015, June 2015
69
Vahid Nikbin, Majid Ataee Pour, Kourosh Shahriar, "Pit Limit Optimization considering the Minimum Width of Pit Bottom ", Third Iranian Open Pit Mines Conference, May 2015
70
Nabiollah Adibee, Majid Ataee Pour, "Ultimate Pit Limit Design with Consideration of Sustainable Development Concepts ", 3rd conference of Iranian open pit mines, May 2015
71
Hamid Ghahremani, Abbas Rahimi, Majid Ataee Pour, "Processing ASTER Data for Identifying Alteration Related Mineralization in the Hudian Area, SE Iran ", The 2nd International Applied Geological congress, May 2015
72
Ehsan Moosavi, Gholamnegad Javad, Majid Ataee Pour, Esmaile Khorram, "Production Scheduling Using Augmented Lagrangian Relaxation and Genetic Algorithm Optimisation ", 24th INTERNATIONAL MINING CONGRESS OF TURKEY (IMCET 2015), April 2015
73
Nabiollah Adibee, Majid Ataee Pour, "Risk Reduction of Minerals’ Revenue in the Economy of Resource Rich Countries ", 24th INTERNATIONAL MINING CONGRESS OF TURKEY (IMCET 2015), April 2015
74
Nabiollah Adibee, Majid Ataee Pour, "Ultimate Pit Limit Selection based on Sustainable Development Indicators and Using of Numerical Taxonomy ", 11th international industrial engineering conference, January 2015
75
Nabiollah Adibee, Majid Ataee Pour, "Determination of minerals production’s share in the country based on modern portfolio theory ", 5th Conference on Mining Engineering, October 2014
76
Zohre Rezaei, Majid Ataee Pour, S.Hassan Madani, "Analysis of underground mine ventilation network reliability factors and
identification of important factor with Analytical Hierarchy ", 5th Conference On Mining Engineering, October 2014
77
Zohre Rezaei, Majid Ataee Pour, S.Hassan Madani, "Reliability metal mine water analysis (lead mine) ", 5th Conference On Mining Engineering, October 2014
78
Nabiollah Adibee, Majid Ataee Pour, "Evaluation of Mining Sector in Mazandaran Province and Iran based on Sustainable Development Criteria ", National Conference on Mining Science, September 2014
79
Ehsan Salehi, Abdolrahim Javaherian, Majid Ataee Pour, Nasser Keshavarz Faraj Khah, Hossein Khoshdel, "Elastic impedance inversion of Oman Sea gas hydrate resources ", 16th Geophysics Conference of Iran, May 2014
80
Amir Zadmoghadas, Hossein Hassani, Majid Ataee Pour, Hamid Sarkheil, Babak Moradi, Reza Sarmadi, "Petrophysical properties modeling using of fractal geometry in case of Shorijeh reservoir in Khangiran hydrocarbon field ", 32rd conference and First International Congress of Earth Sciences, February 2014
81
Ehsan Moosavi, Majid Ataee Pour, Javad Gholamnejad, Esmaile Khorram, "A New Model for Simultaneous Optimization of Production Scheduling and Cutoff Grades
in Open Pit Mines ", 10th International Industrial Engineering Conference, January 2014
82
Ehsan Salehi, Abdolrahim Javaherian, Majid Ataee Pour, Naser Keshavarz Faraj Khah, Hossein Khoshdel, "Pre-stack quantification of gas-hydrate resources using simulated annealing optimisation and rock physics modeling ", The 1st Conference of Geophysical Exploration Petroleum, October 2013
83
Ehsan Musavi, Majid Ataee Pour, Javad Gholamnejad, Esmaile Khorram, "A Lagrangian Relaxation-Genetic Algorithm Heuristic for the Open Pit Mines Production Scheduling Problem ", First International Conference on Mining, Mineral Processing, Metallurgical and Environmental Engineering, September 2013
84
Ali Mahmoodi Moghanlu, Majid Ataee Pour, "ultimate limit determination of Underground mine using floating stope algorithm case study: copper deposit Masjeddaghi ", The 6th International Conference of Iranian Operations Research Society, May 2013
85
Kourosh Shahriar, Majid Ataee Pour, Aliakbar Asrari, "Evaluation of Squeezing Potential in the Sabzkouh Tunnel ", INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, April 2013
86
Nabiollah Adibee, Majid Ataee Pour, "Ultimate Pit Limit Design on Base of Sustainable Development Criteria ", 23rd International Mining Congress & Exhibition of Turkey (IMCET)• 16-19 April 2013 ANTALYA, April 2013
87
Nabiollah Adibee, Majid Ataee Pour, "sustainable development in mining sector ", The first National conference of Approaches reaching sustainable development, March 2013
88
Hesam Dehghani, Majid Ataee Pour, Akbar Esfahanipour, "Evaluation of Mining Projects Using 3D Real Option Valuation ", 9th International Industrial Engineering Conference, January 2013
89
Ehsan Moosavi, Javad Gholam-Nejad, Majid Ataee Pour, Esmaile Khorram, "Optimal cut-off grades calculated in open pit mines withgoal of minimising the deviation from the average grade ", 4th Iranian Mmining Eengineering Conference, October 2012
90
Nabiollah Adibee, Majid Ataee Pour, "Econnomic sustainable development in the mining sector ", International Mining Congress & Expo 2012, October 2012
91
Heydar Bagloo, Majid Ataee Pour, Mohammad Amin Naziri, "Comparison of view points of university, government and industry sectors in evaluating dimension stones quality using AHP technique ", International Mining Congress & Expo 2012, October 2012
92
Hesam Dehghani, Majid Ataee Pour, Akbar Esfahanipour, "The Effect of 3D Economic Uncertainties on the Mining Projects Evaluation ", International Mining Congress, October 2012
93
Nabiollah Adibee, Majid Ataee Pour, Mehdi Rahmanpour, "management of tunnelling excavated waste in urban area for environmental impacts reduction ", 2nd Dam and Tunnel Cconference & Expo, October 2012
94
Nabiollah Adibee, Majid Ataee Pour, "Developments design optimization in underground mining ", 4th Iranian Mmining Eengineering Conference, October 2012
95
Majid Ataee Pour, Mehdi Rahmanpour, Nabiollah Adibee, "Simultaneous optimization of profit and ore content in pit limit determination ", 4th Iranian Mining Engineering Conference, October 2012
96
Nabiollah Adibee, Majid Ataee Pour, "A procedure for construction of low grade stockpiles in open pitmines ", 4th Iranian Mining Engineering Cconference, October 2012
97
Parinaz Dibarzar, Kourosh Shahriar, Majid Ataee Pour, "Failure Management in Deviation Tunnel of Silveh Dam with with Water detouring Using Cement Injection ", International Mining Congress & Expo 2012, October 2012
98
Zohre Rezaei, Majid Ataee Pour, Samira Zndi, "Digital Image Processing in Downstream Geostatistical Approach ", International Mining Congress & Expo 2012, October 2012
99
Aliakbar Asrari, Kourosh Shahriar, Majid Ataee Pour, "pridiction of squeezing potential using adaptive neuro-fuzzy interface system ", The International Mining Congress and Expo, October 2012
100
Masood Monjezi, Majid Ataee Pour, Noshin Azadi, "Application of Arena software tools to optimise the fleet size of the Sungon copper mine transportation ", International Mining Congress & Expo 2012, October 2012
101
Ehsan Salehi, Abdolrahim Javaherian, Majid Ataee Pour, Naser Keshavarz Farajkhah, "Estimation of gas hydrate sediments acoustic properties using seismic inversion ", 15th Geophysics Conference of Iran, May 2012
102
Hesam Dehghani, Majid Ataee Pour, "Determination of Block Economic Value under the economic uncertainty ", The First Iranian Mining Technologies Conference, May 2012
103
Hesam Dehghani, Majid Ataee Pour, Akbar Esfahanipour, "The Role of Price Uncertainty in Block Economic Value Determination Using the Binomial Tree Method ", The 8th International Industrial Engineering Conference, February 2012
104
ٍٍEhsan Moosavi, Javad Gholamnejad, Majid Ataee Pour, "Mill Cutoff Grade Determination Using Linear Programming Model ", 1st World Copper Congress, October 2011
105
Mohsen Taheri Moghadder, Mehdi Irannajad, Majid Ataee Pour, "Estimated capital cost for projects in the copper mining industry of iran ", The 1st world copper congress, October 2011
106
Elnaz Siami Irdemoosa, Majid Ataee Pour, Ayatollahi, Haratian, "A Framework to Develop the Work Breakdown Structure (WBS) in Tunneling Projects ", 1st Asian and 9th Iranian Tunnelling Symposium, October 2011
107
Hesam Dehghani, Majid Ataee Pour, "The effect of operating costs uncertainty on the project evaluation ", 22nd World Mining Congress & Expo, September 2011
108
Elnaz Siami Irdemoosa, Majid Ataee Pour, Mostafa Sharifzadeh, F. Ayatollahi, "Designing work breakdown structure(WBS) in tunneling projects using neural networks ", 45th US Rock Mechanics/ Geomechanics Symposium, June 2011
109
Mohsen Taheri Moghadder, Majid Ataee Pour, Mehdi Irannajad, "Estimating the Discount Rate for Mining Projects of Gol-E-Gohar Mining Complex ", International Mining Congress & Expo, Iran, December 2010
110
Majid Ataee Pour, Hesam Dehghani, "The effect of Risk in Mine Planning Stage ", International Mining Congress & Expo, Iran, October 2010
111
Majid Ataee Pour, Mostafa Sharifzadeh, Elnaz Siami Irdemoosa, "Research Of Effective Methodologies On Designing Tunneling Projects Work Breakdown Structure (WBS) ", هفتمین کنفرانس بین المللی مهندسی صنایع, October 2010
112
Mohsen Taheri Moghadder, Mehdi Irannajad, Majid Ataee Pour, "Discount rate estimation for mining projects evaluation considering risk ", Iranian Mining Engineering Conference, January 2010
113
Majid Ataee Pour, Mohsen Taheri Moghadder, Mehdi Irannajad, "Evaluation of mining projects using Real Options Method ", Iranian Mining Engineering, January 2010
114
[en-name N/A], Mehdi Irannajad, Majid Ataee Pour, "An apprach to determine the locations of in pit crushers in deep open mines ", , June 2009
115
Mohsen Taheri Moghadder, Mehdi Irannajad, Majid Ataee Pour, "selection of tailing site of gol- e - gohar iron ore processing plant using the modified topsis method ", 9th international multidisciplinary scientific geoconference, February 2009
116
Mohsen Taheri Moghadder, Majid Ataee Pour, Mehdi Irannajad, Saeed Maknoni Gilani, "Tailings dam location to bring work home oven Gol Gohar Iron Ore Complex using fuzzy topsis ", Safety Conference. Health and Environment in Mines and Mineral Industries, November 2008
117
Abdolah Sadri, Majid Ataee Pour, Rohollah Simorghi Gargari, "Development of an open pit transportation Software based on combined model of truck-shovel Assignmennt ", 2nd Iranian Mining Engineering Conference, October 2008
118
Mohsen Taheri Moghadder, Majid Ataee Pour, Mehdi Irannajad, "Selection of Tailings Site of Gol-e-Gohar Iron Ore Processing Plant Using the Modified TOPSIS Method ", International Mineral Processing Congress, September 2008
119
Abdolah Sadri, Majid Ataee Pour, Rohollah Simorghi Gargari, "Compound Modelling of Truck-Shovel System for Determining the Optimised Traveling Path Based on TSP Modelling ", International Multidisciplinary Scientific Conference _ SGEM 2008, June 2008
120
Abdolah Sadri, Majid Ataee Pour, Rohollah Simorghi Gargari, "Development of a software for assignment of N Trucks to M Shovels with Different Mineral Grades Based on Dynamic Programming Algorithm ", International Multidisciplinary Scientific Conference _ SGEM 2008, June 2008
121
[en-name N/A], Majid Ataee Pour, S.Hasan Khoshrou, "An investigation on the rock fragmentation prediction models based on rock and rock mass properties ", , October 2007
122
Abdolah Sadri, Majid Ataee Pour, Rohollah Simorghi Gargari, "Development of an open pit transportation software based on combined model of truck shovel asignment ", , June 2007
123
Ali Sami, Majid Ataee Pour, S.Hasan Khoshrou, "Rock fragmentation assessment using the image analysis method: quality of a blast in surface minign ", , June 2007
124
Seyed Ehsan Jalali Mousavi, Majid Ataee Pour, Kourosh Shahriar, "Rigorous algorithms to optimise stope boundaries capabilities, restrictions and applications ", , June 2007
125
Abdolah Sadri, Majid Ataee Pour, Rohollah Simorghi Gargari, "Design and introducing a real- time assignment software of truck- shovel system ", , June 2007
126
Seyed-Mohammad Esmaiel Jalali, Majid Ataee Pour, "Pit limits optimization using markov chains ", , January 2006
127
Majid Ataee Pour, Alireza Damiry, Abdolah Sadri, "Optimization of the havlage system in choghart iron ore mineby using arena ", , October 2005
128
Majid Ataee Pour, "a lincar model for determination of black economic values ", , March 2005
129
Majid Ataee Pour, "Simulation models for preveme maintenance systems ", , September 2004
130
Seyed-Mohammad Esmaiel Jalali, Majid Ataee Pour, "A 2D dynamic pnogramming algorithm to optimise stope boundaries ", , September 2004
131
Majid Ataee Pour, Ernest Y. Baafi, "SLO-A program for stope limit optimisation using a heuristic algorithm ", , June 2003
132
Ernest Y. Baafi, Majid Ataee Pour, "Stope Optimiser - A FORTRAN Program to Optimise Stop Boundaries ", , June 2001
133
Majid Ataee Pour, Ernest Y. Baafi, "Visual Basic Implementation of the Maximum Value Neighbourood Algorithm to Optimise Stope Boundaries ", , January 2000
134
Majid Ataee Pour, Ernest Y. Baafi, "Stope Optimisation Using the Maximum Value Neighbourhood (MVN) Concept ", , January 1999
135
Majid Ataee Pour, Ernest Y. Baafi, "Application of ARENA simulation sytem to compare truck _ shovel operation in dispatching and non _ dispatching modes ", , January 1998
136
Majid Ataee Pour, Ernest Y. Baafi, "Implementation of a heuristic algonthm to optimise stope limits with excel modules ", , January 1998
137
Majid Ataee Pour, Ernest Y. Baafi, "A new heuristic algorith to optimise stope boundaries ", , January 1997
138
Majid Ataee Pour, Ernest Y. Baafi, "Truek dispatching simulation with arena modeling system ", , January 1997
139
Ernest Y. Baafi, Majid Ataee Pour, "Simulation of a truck _ shonel system using arena ", , January 1996