Field Mine Surveying
- Distance Measurement by tape on sloping land
- Working with handy-GPS
- Working with Leveling equipment, Booking and Field Reduction Procedures for Leveling.
- Working with the theodolite and carrying out traversing using it
- Introducing the Total Station and its setting and data collection by total stattion
- Establishing horizontal controls i.e., known positions (Eastings and Northings), Horizontal controls for topographic and detail.
- Know the types of traverses and perform all the calculations that are required to obtain traverse coordinates from measured angles and distances, triangulation, intersection and resection.
- Working with multi-frequency GPS
- Perform area and volume calculations