1
H. Rouhani, M. Arash, E. Farrokh,
"Investigating the effects of confining pressure and loading rate on damage propagation and mode I stress intensity factor of granite using the RHT constitutive model",
Geomechanics and Geophysics For Geo-Energy and Geo-Resources,
vol. 11,
no. 79,
pp.1-18,
2025.
2
R. Mohammad Matin, E. Farrokh,
"TBM performance prediction based on XGBoost models: a case study of the ghomrud water conveyance tunnel (Lots 3 and 4)",
Bulletin of Engineering Geology and The Environment,
vol. 84,
no. 304,
pp.1-22,
2025.
3
E. Farrokh, Davood Lotfi,
"Decision tree analysis of cutter selection for tunnel boring machines: A study of geological conditions and machine types in high-performing TBM projects",
Tunnelling and Underground Space Technology,
vol. 162,
no. 106612,
pp.1-14,
2025.
4
E. Farrokh,
"Optimum design specifications of TBM cutterheads in soft ground conditions based on field data analysis",
Tunnelling and Underground Space Technology,
vol. 161,
no. 106522,
pp.1-14,
2025.
5
Young Jin Shin, E. Farrokh, Jaehoon Jung, Hanbyul Kang,
"Optimizing Tunnel Boring Machine Operations in Real Time within Defined Constraints",
Journal of Construction Engineering and Management,
vol. 151,
no. 6,
pp.1-14,
2025.
6
E. Farrokh,
"Evaluating the Penetration Rate of Earth Pressure Balance Tunnel Boring Machines",
Amirkabir Journal of Civil Engineering,
vol. 56,
no. 11,
pp.1431-1452,
2024.
7
H. Rouhani, E. Farrokh,
"Failure analysis of Nehbandan granite under various stress states and strain rates using a calibrated Riedel-Hiermaier-Thoma constitutive model",
Geomechanics and Geophysics For Geo-Energy and Geo-Resources,
vol. 10,
no. 157,
pp.1-23,
2024.
8
D. Mohammadi, K. Shahriar, P. Maarefvand, E. Farrokh,
"Cutting wheel opening configuration in soft ground shield tunneling by considering field and numerical studies",
Journal of Mining and Environment,
vol. 0,
no. 0,
,
2024.
9
E. Farrokh, Hamid Rokhy, Davood Lotfi,
"On the application of RHT model and SPG algorithm for the analysis of rock cutting process",
Simulation Modelling Practice and Theory,
vol. 136,
no. 103012,
pp.1-15,
2024.
10
M. Heydari, E. Farrokh, S. Khoshrou,
"Parameter determination of Johnson-Holmquist-Cook constitutive model and calibration for Indiana Limestone",
Geomechanics and Geophysics For Geo-Energy and Geo-Resources,
vol. 10,
no. 122,
pp.1-26,
2024.
11
E. Farrokh,
"Design and optimization of layout patterns for rock TBM cutterheads",
Geomechanics and Engineering,
vol. 38,
no. 2,
pp.179-189,
2024.
12
E. Farrokh, Hamid Rokhy, Davood Lotfi,
"Evaluation of side forces for gauge cutters through LS-DYNA 3D numerical simulations",
Arabian Journal of Geosciences,
vol. 17,
no. 211,
pp.1-8,
2024.
13
R. Mohammad Matin, E. Farrokh,
"Chisel bits cutting force estimation using XGBoost and different optimization algorithms",
Computers and Geotechnics,
vol. 172,
no. 10646,
pp.1-13,
2024.
14
S. Fattahi Dehkaboodi, E. Farrokh, Davood Lotfi,
"Study of the effect of penetration depth and disc speed on cutting forces using LS-DYNA simulations",
Amirkabir Journal of Civil Engineering,
vol. 0,
no. 0,
pp.1-18,
2023.
15
Young Jin Shin, E. Farrokh, Jaehoon Jung, Jaewon Lee, Hanbyul Kang,
"A study of rotary cutting machine (RCM) performance on Korean Granite",
Engineering Computations,
vol. 0,
no. 0,
pp.1-35,
2023.
16
D. Mohammadi, K. Shahriar, P. Maarefvand, E. Farrokh,
"Discussion of cutterhead opening design for earth pressure balance machines (EPBMs)",
Proceedings of The Institution of Civil Engineers-Geotechnical Engineering,
vol. 0,
no. 0,
pp.1-15,
2023.
17
M. Tarafrava, E. Farrokh,
"Estimation of the stability number and face pressure of the tunnel at the serviceability limit state based on the results of numerical modeling",
Journal of Analytical and Numerical Methods In Mining Engineering,
vol. 13,
no. 34,
pp.27-39,
2023.
18
E. Farrokh,
"Slump value and consistency index relationship for the application of EPB TBMs",
Arabian Journal of Geosciences,
vol. 16,
no. 282,
pp.1-10,
2023.
19
E. Farrokh, Davood Lotfi, Rohullah Khorshid,
"Lace design simulation for the layout optimization of rock cutterheads",
Arabian Journal of Geosciences,
vol. 16,
no. 123,
pp.1-20,
2023.
20
S. Fattahi Dehkaboodi, E. Farrokh, Vahhab Sarfarazi,
"Investigating the effect of changing the depth of penetration, contact area and speed of the cutting disc on the forces acting on the cutting disc with a V-shaped edge",
Journal of Rock Mechanics,
vol. 6,
no. 3,
pp.13-21,
2022.
21
E. Farrokh,
"Design of cutterhead layout pattern for rock head micro-TBMs",
Arabian Journal of Geosciences,
vol. 15,
no. 1425,
pp.1-14,
2022.
22
E. Farrokh,
"Using field data and operational constraints to maximize hard rock TBM penetration and advance rates",
Tunnelling and Underground Space Technology,
vol. 125,
no. 104506,
pp.1-18,
2022.
23
M. Ameri, E. Farrokh, H. Moladavoodi,
"TBM penetration rate prediction using neural networks and neuro-fuzzy systems",
Tunneling & Underground Space Engineering,
vol. 10,
no. 1,
pp.35-56,
2022.
24
E. Farrokh,
"Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration and TBM advance",
Arabian Journal of Geosciences,
vol. 14,
no. 2049,
pp.1-18,
2021.
25
E. Farrokh, Alireza Amiri, Asadollah Hasoomi,
"Volume loss and face pressure evaluation in Tehran metro line 6, south extension",
Tunnelling and Underground Space Technology,
vol. 116,
no. 104113,
pp.1-16,
2021.
26
E. Farrokh,
"Cutter change time and cutter consumption for rock TBMs",
Tunnelling and Underground Space Technology,
vol. 114,
no. 104000,
pp.1-15,
2021.
27
E. Farrokh,
"Primary and secondary tools' life evaluation for soft ground TBMs",
Bulletin of Engineering Geology and The Environment,
vol. -,
no. 0,
pp.1-19,
2021.
28
E. Farrokh,
"Construction time optimization for large underground excavations",
,
vol. 15,
no. 49,
pp.49-66,
2021.
29
E. Farrokh,
"Uniformly distributed lace design for hard rock TBMs",
Tunnelling and Underground Space Technology,
vol. 110,
no. 103829,
pp.1-13,
2021.
30
E. Farrokh,
"Lace Design Optimization for Hard Rock TBMs",
Amirkabir Journal of Civil Engineering,
vol. 0,
no. 0,
pp.1-22,
2020.
31
E. Farrokh,
"Optimum design of the peripheral cutters' specification on the head profile for hard-rock TBMs",
Tunnelling and Underground Space Technology,
vol. 107,
no. 1,
pp.1-11,
2020.
32
E. Farrokh,
"Positioning the Peripheral Cutters in Hard Rock TBMs",
Tunneling & Underground Space Engineering,
vol. 9,
no. 3,
pp.207-228,
2020.
33
E. Farrokh,
"Force-Penetration Interaction Diagram for Hard Rock TBMs Performance Optimization",
Amirkabir Journal of Civil Engineering,
vol. 0,
no. 0,
,
2020.
34
E. Farrokh,
"A Study of Cutter Life and Its Influential Factors in Ghomrud Water Conveyance Tunnel",
Tunneling & Underground Space Engineering,
vol. 9,
no. 2,
pp.163-181,
2020.
35
E. Farrokh,
"Face Pressure Evaluation in Serviceability Limit State",
Amirkabir Journal of Civil Engineering,
vol. 0,
no. 0,
,
2020.
36
E. Farrokh,
"TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period",
Journal of Mining and Environment,
vol. 0,
no. 0,
,
2020.
37
E. Farrokh,
"A study of various models used in the estimation of advance rates for hard rock TBMs",
Tunnelling and Underground Space Technology,
vol. 97,
no. 103219,
pp.1-14,
2020.